My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1200 INDUSTRY ST 2025-03-24
>
Address Records
>
INDUSTRY ST
>
1200
>
1200 INDUSTRY ST 2025-03-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 11:30:51 AM
Creation date
2/26/2025 11:54:49 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1200
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Testing agency shall Notify Consultant/ Designer and Contractor promptly of irregularities <br /> or deficiencies observed in the Work during performance of its services. <br /> 2. Determine the location from which test samples will be taken and in which in-situ tests are <br /> conducted. <br /> 3. Conduct and interpret tests and inspections and state in each report whether tested and <br /> inspected work complies with or deviates from requirements. <br /> 4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality- <br /> control service through Contractor. <br /> 5. Do not release, revoke, alter, or increase the Contract Document requirements or approve <br /> or accept any portion of the Work. <br /> 6. Do not perform any duties of Contractor. <br /> E. Coordination: Coordinate sequence of activities to accommodate required quality-assurance <br /> and -control services with a minimum of delay and to avoid necessity of removing and replacing <br /> construction to accommodate testing and inspecting. <br /> 1. Schedule times for tests, inspections, obtaining samples, and similar activities. <br /> PART 2 - PRODUCTS (NOT USED) <br /> PART 3 - EXECUTION <br /> 3.01 TEST AND INSPECTION LOG <br /> A. Maintain log at Project site. Post changes and modifications as they occur. Provide access to <br /> test and inspection log for Consultant/ Designer's reference during normal working hours. <br /> Submit the final log to the Consultant/ Designer upon closeout of the project. <br /> 3.02 REPAIR AND PROTECTION <br /> A. General: On completion of testing, inspecting, sample taking, and similar services, repair <br /> damaged construction and restore substrates and finishes. <br /> 1. Comply with the Contract Document requirements for Division 1 Section "Execution". <br /> B. Protect construction exposed by or for quality-control service activities. <br /> C. Repair and protection are Contractor's responsibility, regardless of the assignment of <br /> responsibility for quality-control services. <br /> END OF SECTION 01 4000 <br /> SEA00511 / Prologis - SEA00511 01 4000 - 5 QUALITY REQUIREMENTS <br /> - FY24- Everett 1 - Capital <br /> Roofing Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.