My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
2930 MAPLE ST KAISER PERMANENTE 2025-05-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2025 8:59:13 AM
Creation date
3/7/2025 2:47:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1542
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />all damages caused by or related to its failure to comply with the requirements of <br />this provision. <br />2. Submittal review shall be performed to show compliance with the design intent. <br />Contractor shall specifically note any deviations from the Contract Documents and <br />explain the reason and nature of the deviation. Such deviations will be reviewed <br />or rejected on the submittal. Deviations not so identified shall not relieve the <br />Contractor from the requirements of the Contract Documents. <br />3. Resubmittals will be reviewed for compliance with comment(s) made on the <br />original submittal only. Architect/Engineer shall not be responsible for changes <br />made upon resubmittal that are not clearly identified (highlighted) and respond <br />directly to the initial rejection. Resubmittals should not be packaged with non - <br />related first time submittals; all resubmittals must be marked with the resubmittal <br />number and date and must otherwise comply with all submittal requirements. <br />4. Submit shop drawings, commissioning plan(s) and checklists, penetration <br />locations, supplemental data, etc., as may be required by the Contract Documents <br />for all materials, equipment and other components of the work included in all <br />Sections of this Division and other provisions of the Contract Documents in <br />accordance with the requirements of this Division and Division 01. <br />5. All submittals must be reviewed by Contractor, and bear Contractors review stamp <br />and signoff for Conformity to the Contract Documents, prior to the submission of <br />any required submittal to Architect/Engineer. Submittals that fail to meet this <br />requirement will be considered incomplete, will not be reviewed by <br />Architect/Engineer and will be returned to Contractor, without review and/or <br />rejected and resubmittal will be required. Contractor shall be solely responsible for <br />any and all Additional Review Costs and/or other project costs or schedule impact. <br />6. Forward all submittals to Architect/Engineer in a coherent, organized fashion, <br />complete and packaged as required herein, Architect/Engineer may reject <br />submittals that fail to comply with this or any other provision of the Contract <br />Documents and Contractor shall be solely responsible for any and all Additional <br />Review Costs and/or other project costs or schedule impact. <br />7. Subject to other provisions of the Contract Documents and in the absence of a <br />more stringent requirement, Architect/Engineer will review a submittal not more <br />than two (2) times. Contractor shall be solely responsible for any and all Additional <br />Review Costs and/or other project costs or schedule impact. <br />8. Identify each submittal item by reference to Specification Section paragraph in <br />which item is specified, or drawing/detail number, as applicable. In addition, for <br />equipment submittals, include identification numbers appearing on the equipment <br />schedule. <br />9. Identify each item by manufacturer, brand, trade name, number, size, rating, or <br />whatever other data is necessary to properly identify and check materials and <br />equipment. Words "as specified" are not sufficient identification. <br />10. Organize submittals in same sequence as they appear in specification sections, <br />articles or paragraphs. <br />11. All materials and equipment submittals shall have a summary sheet at the front <br />complete with catalog numbers. Where materials or equipment pertain to more <br />than one building, submittals shall clearly indicate at which locations the materials <br />or equipment is to be installed. <br />12. Submittals shall show physical arrangement, construction details, finishes, <br />materials used in fabrications, provisions for piping and/or conduit entrance, <br />access requirements for installation and maintenance, physical size and <br />dimension, electrical characteristics and requirements, foundation/curbs and all <br />permanent and temporary support details as well as all information relating to <br />weight, including but not limited to live and dead weights. <br />BASIC ELECTRICAL REQUIREMENTS 2601 00 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.