Laserfiche WebLink
KAISER PERMANENTE <br />ASC & Clinic (HUB) <br />Everett, WA <br />Site Prep #1 Electrical Service <br />March 18, 2020 <br />Proiect No. 19.05002.00 <br />D. Catalog Cuts and Submittal Literature: Catalog cuts, submittal literature and published <br />material may be included to supplement scale drawings. <br />1. Prepare submittals electronically in accordance with the following and Division 01. <br />2. Submittal literature, drawings and diagrams shall be specifically applicable to this <br />project and shall not contain extraneous material or optional choices. Clearly mark <br />literature to indicate the proposed item. <br />3. Substitutions: Comply with Division 01 Product Substitution Procedures. <br />E. Shop Drawings: <br />1. Shop drawings shall include all significant Division systems, equipment and <br />components, including but not limited to all terminal devices, connections and <br />elevations. Include all related specialty rooms (i.e., electrical, data/technology). <br />Drawings shall be at a minimum scale of 1/4 inch per 1 ft.-0 inch and shall be fully <br />coordinated with the work of other trades and/or Sections. <br />2. Identify congested areas and clearly indicate solutions to space problems, <br />developed in conjunction with the work of other trades and/or Sections. <br />Identification of space problems without proposed solutions is not acceptable and <br />is grounds for rejection. For such areas indicate, superimposed, the work of all <br />trades and/or Sections involved and: <br />a. Clearly identify each area of congestion and deviations from the Contract <br />Documents, and: <br />b. Proposed solution(s), clearly documented and signed -off by all other <br />trades and/or Sections involved. <br />F. Anchorage and Supports: Submit details and calculations for support and anchors that are <br />not specifically detailed on the drawings. All calculations must meet 2015 IBC. <br />1. Provide details and calculations for electrical equipment per 2015 IBC: <br />a. Having an operating weight over 400 pounds or more and mounted directly <br />to the floor. <br />b. Having an operating weight over 20 pounds and suspended from the roof, <br />floor, or wall or supported by vibration isolation devices. <br />2. Where pre -approved bracing systems will be employed, submit: <br />a. System component brochure describing components used and detailed <br />installation instructions. <br />b. Loads to be transmitted to the structure at anchor points. <br />3. Where anchorage, support, and bracing are not detailed on the drawings, and pre - <br />approved systems are not used, submit details and calculations of proposed <br />systems. Include: <br />a. Detailed drawings showing system to be installed, stamped by a Structural <br />Engineer registered in the State of Washington. <br />b. Anchorage and Supports: <br />1) Where equipment substitutions change the weight, size, <br />configuration, or other aspects of systems and equipment that will <br />affect the performance of anchorages and/or supports, submit <br />calculations for proposed anchors and supports, and install them <br />as shown in these calculations. <br />2) Where substitutions will have no effect on anchors and supports <br />detailed on Contract Documents, submit information on sizes, <br />weights, center of gravity and other relevant information to <br />demonstrate this fact. <br />BASIC ELECTRICAL REQUIREMENTS 2601 00 - 5 <br />