My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2930 MAPLE ST KAISER PERMANENTE Geotech Report 2025-03-07
>
Address Records
>
MAPLE ST
>
2930
>
KAISER PERMANENTE
>
Geotech Report
>
2930 MAPLE ST KAISER PERMANENTE Geotech Report 2025-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2025 3:41:52 PM
Creation date
3/7/2025 3:39:49 PM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2930
Tenant Name
KAISER PERMANENTE
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report-Revised lrerracon <br /> Kaiser Everett Medical Center Everett,Washington -- s--- y� <br /> December 18, 2019 Terracon Project No. 81195071 GeoReport <br /> Item Description <br /> Based on the information provided on September 12, 2019, the project <br /> will consist of two possible construction options. <br /> Option 1: <br /> Construct a 4-story(approximate 231,000 square foot) parking <br /> structure to the west of the existing medical office building and a <br /> new 4-story (approximate 138,000 square foot) hub/ASC building <br /> Proposed Structures south of the existing medical office building. <br /> - Option 2: <br /> Construct a 4-story (approximate 218,000 square foot) parking <br /> structure to the south of the existing medical office building and a <br /> new 4-story (approximate 120,000 square foot) hub/ASC building <br /> west of the existing medical office building. <br /> No information has been provided to date regarding the structure <br /> Building Construction construction. Our scope of services assumes that no below grade <br /> structures are proposed. <br /> Finished Floor Elevation Unknown at the time of this report <br /> ■ Columns: 200 kips <br /> Maximum Loads ■ Walls: 5 kips per linear foot (klf) <br /> (assumed) ■ Slabs: 150 pounds per square foot(psf) <br /> We anticipate the site will be leveled to accommodate parking and <br /> Grading/Slopes driveways. Cuts will likely be required for the western portion with filling to <br /> the east. <br /> The assumed pavement design period is 20 years. <br /> Pavements Anticipated traffic is as follows: <br /> ■ Light-duty car and parking areas: 40,000 ESALs (assumed) <br /> ■ Heavy-duty truck parking areas: 80,000 ESALs (assumed) <br /> GEOTECHNICAL CHARACTERIZATION <br /> We have developed a general characterization of the subsurface conditions based upon our <br /> review of the subsurface exploration, laboratory data, geologic setting and our understanding of <br /> the project. Conditions encountered at each exploration point are indicated on the individual logs. <br /> The individual logs can be found in the Exploration Results section. As noted in General <br /> Comments, the characterization is based upon widely spaced exploration points across the site, <br /> and variations are likely. <br /> Responsive ■ Resourceful ■ Reliable 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.