My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-42 <br />1-06.3 Manufacturer’s Certificate of Compliance <br />Supplement 1-06.3 by adding the following: <br />When authorized by the Standard Specifications or these Special Provisions and prior to <br />use, the Engineer may accept certain Equipment on the basis of a Manufacturer’s <br />Certificate of Compliance as an alternate to Equipment inspection and testing. <br />A Manufacturer’s Certificate of Compliance shall be reserved for cases where <br />compliance to Contract requirements is not readily determinable through inspection and <br />testing of materials or Equipment. The Contractor shall provide properly authenticated <br />documents to the City’s Representative that the materials and Equipment comply with <br />the Contract requirements. <br />The Contractor shall pay all associated costs of providing each Manufacturer’s <br />Certificate of Compliance submitted for City acceptance. <br />The City reserves the right to refuse to accept Equipment on the basis of a <br />Manufacturer’s Certificate of Compliance. <br />1-06.3(1) Inspection at Point of Manufacturing <br />(*****) <br />The Contractor shall be responsible to reimburse the City for the costs of inspections at <br />the point of manufacturing for inspections occurring outside of Whatcom, Skagit, Island, <br />Snohomish, King, Pierce and Thurston counties. Costs to be paid or reimbursed by the <br />Contractor include, but are not limited to, travel, subsistence, labor and lodging <br />expenses of the City Inspector. <br />Point of manufacturing inspection will be required if: <br />Inspection and testing of materials or Equipment in the vicinity of the Work by the City is <br />not practicable, <br />The Contractor requests the City to inspect and test material or Equipment at the point of <br />manufacture, or <br />The Standard Specifications or these Special Provisions require that inspection, testing <br />or witnessing of tests take place at the point of manufacture. <br />1-06.4 Handling and Storing Materials <br />Supplement 1-06.4 by adding the following: <br />Contractor shall store materials and Equipment so as to insure the preservation of their <br />quality and fitness for the Work. Contractor shall store Equipment and materials at <br />location that facilitates inspection. The Contractor shall be responsible for damages, loss <br />or casualty occurring to materials and Equipment until Final Acceptance. <br />1-06.6 Recycled Materials <br />Delete 1-06.6 and its subsections and substitute the following: <br />The Contractor shall make best effort to utilize recycled materials in the construction of <br />the project as detailed in elsewhere in the Standard Specifications and these Special <br />Provisions. <br />Prior to Physical Completion Contractor shall report the quantity of recycled materials <br />utilized in the construction of the project for each of the items listed in Section 9-03.21. <br />Include hot mix asphalt, recycled concrete aggregate, recycled glass, steel furnace slag <br />and other recycled materials (e.g. utilization of on-site material and aggregates from
The URL can be used to link to this page
Your browser does not support the video tag.