My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-99 <br />24. Job diaries. <br />25. All documents which relate to each and every claim together with all documents <br />which support the amount of damages as to each claim. <br />1-09.13 Claims Resolution <br />Delete all of 1-09.13 and substitute the following: <br />Prior to seeking claim resolution through litigation, the Contractor shall proceed under <br />the procedures in Sections 1-04.5 and 1-09.11 and elsewhere in the Contract <br />Documents for resolution of disputes. These must be complied with in full, as a condition <br />precedent, to the Contractor’s right to seek claim resolution through litigation. <br />Supplement Section 1-09 by adding the following: <br />1-09.14 Patents and Royalties <br />(*****) <br />Should the Contractor, its agent, employee or any of them be enjoined from furnishing or <br />using any invention, article, material or plans supplied or required to be supplied or used <br />under this Contract, Contractor shall promptly pay such royalties and secure requisite <br />licenses; or, subject to acceptance by City, substitute other articles, materials, or appliances <br />in lieu thereof that are of equal efficiency, quality, finish, suitability and market value to those <br />planned or required under the Contract. Descriptive information of these substitutions shall <br />be submitted to the City’s Representative for determination of general conformance to the <br />design concept and the construction Contract. Should City elect to refuse the substitution, <br />Contractor agrees to pay such royalties and secure such valid licenses as may be requisite <br />for the City, its officers, agents and employees or any of them, to use such invention, article, <br />material or appliance without being disturbed or in any way interfered with by any <br />proceeding in law or equity on account thereof. <br />Costs involved in fees, royalties, or claims for any patented invention, article, process or <br />method that may be used upon or in a manner connected with the Work under this Contract <br />or with use of completed Work by the City shall be paid by the Contractor. The Contractor <br />and its sureties shall protect and hold the City, and City's Representative, together with its <br />officers, agents, and employees, harmless from any and all loss, defense cost, and <br />expenses and against any and all demands made for such fees or claims brought or made <br />by the holder of any invention or patent. Before final payment is made on the account of this <br />Contract, the Contractor shall, if requested by the City, furnish acceptable proof of a proper <br />release from all such fees or claims. <br />1-10 TEMPORARY TRAFFIC CONTROL <br />1-10.1 General <br />1-10.1(2) Description <br />Supplement 1-10.1(2) as follows: <br />The Contractor shall provide a uniformed off-duty Police Officer to control traffic for <br />work at signalized intersections and other critical situations as determined by the <br />Engineer.
The URL can be used to link to this page
Your browser does not support the video tag.