My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-100 <br />1-10.2 Traffic Control Management <br />1-10.2(1) General <br />Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the following: <br />The primary and alternate TCS shall be certified as worksite traffic control <br />supervisors by one of the organizations listed below: <br />à Evergreen Safety Council (800) 521-0778 <br />à Northwest Laborers Union (800) 240-9112 <br />à American Traffic Safety Services Association (877) 642-4637 <br />1-10.2(2) Traffic Control Plans <br />Delete the first paragraph of 1-10.2(2) and substitute the following: <br />Contractor may use City’s Standard Traffic Control Plans included in COE Standard <br />Drawings, Series 700. The City does not represent or warrant that the Standard <br />Plans are sufficient, adequate or complete for the Contractor’s means, methods or <br />plan of Work. If a new or additional Traffic Control Plan is necessary, prepare <br />detailed Traffic Control Plan complying with COE Standard Drawings, Series 700, <br />the MUTCD, Part 6, and the most current edition of the PROWAG (Public Rights-of- <br />Way Accessibility Guidelines). Plan preparation shall be at Contractor’s sole cost and <br />submitted to the City for approval at least 14 calendar days before starting Work. <br />Work may not begin until Contractor is in receipt of City approved Traffic Control <br />Plan. <br />1-10.3 Traffic Control Labor, Procedures and Devices <br />Delete 1-10.3 and substitute the following: <br />1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br />(*****) <br />1-10.3(1) General <br />The Contractor shall provide all flaggers, signs and other traffic control devices. The <br />Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br />and other traffic control devices necessary to warn and protect the public at all times <br />from injury or damage as a result of the Contractor's operations that may occur on <br />highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br />all necessary signs and traffic control devices are in place. <br />Flaggers and spotters shall possess a current flagging card issued by the State of <br />Washington, Oregon, Montana, or Idaho. The flagging card shall be immediately <br />available and shown upon request by the City. <br />1-10.3(2) Maintenance and Protection of Traffic Control <br />When the Bid proposed includes an item for "Maintenance and Protection of Traffic <br />Control", the Work required for this item shall be to: <br />1. Furnish and maintain signs, cones, barricades, flasher, and other channelization <br />devices; <br />2. Provide supervisory personnel for all labor for traffic control; <br />3. Provide labor and necessary vehicle(s) for set-up and removal of construction <br />signs and the traffic control devices that are placed daily;
The URL can be used to link to this page
Your browser does not support the video tag.