My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-101 <br />4. Provide labor and vehicles for patrolling and maintaining in position all of the <br />construction signs and the traffic control devices; <br />5. Provide labor, material, and equipment necessary for cleaning up, removing and <br />replacing all construction signs and traffic control devices that are destroyed, <br />damaged or lost during the life of the project; <br />6. Provide flagging or use of police officers for the convenience of the Contractor, <br />such as facilitating movement of equipment on the site, laying out or relocating <br />traffic control devices and signs. <br />7. Cost associated with preparation and distribution of public notices involving <br />parking, street access or traffic issues. <br />Upon failure of the Contractor to immediately provide flaggers, erect, maintain, and <br />remove signs; or provide, erect, maintain, and remove other traffic control devices when <br />ordered to do so by the Engineer, the City may without further notice to the Contractor or <br />the Surety, perform any of the above and deduct all or the costs from the Contractor's <br />payments. <br />The Contractor shall be responsible for providing adequate flaggers, signs, and other <br />traffic control devices for the protection of the worker and the public at all times <br />regardless of whether or not the flaggers, signs, and other traffic control devices are <br />ordered by the Engineer, or paid for by the City. The Contractor shall be liable for injuries <br />and damages to persons and property suffered by reason of the Contractor's operations <br />or negligence in connection therewith. <br />1-10.3(3) No Passing Zones <br />The striping of no passing zones that are to be obliterated in excess of 150-feet by <br />paving operations shall be replaced by "Do Not Pass" and "Pass With Care" signs. The <br />signs shall be located not less than 2-feet outside the usable shoulder nor less than 7- <br />feet above the edge of pavement. The number of necessary signs will be specified in the <br />Special Provisions. <br />The Contractor shall provide and install the signs and sign posts. The signs shall be <br />maintained by the Contractor until construction operations are complete. When the <br />project includes striping by the Contractor, the signs and posts shall be removed by the <br />Contractor when the no passing zones are re-established by striping. <br />When the Contractor is not responsible for striping, the signs and posts shall be <br />removed by the Contractor when the "No Passing Zones" are re-established by striping. <br />Payment to perform the Work required for this subsection will be under the item <br />"Maintenance and Protection of Traffic Control.” <br />1-10.3(4) Traffic Control Labor <br />The Contractor shall furnish all personnel for flagging to control traffic during <br />construction operations. Flaggers shall have a current certification (Flagging Card) from <br />the State Department of Labor and Industries (WAC 296-155-305). Employees of the <br />Contractor engaged in flagging or traffic control shall wear reflective vests and hard hats. <br />During hours of darkness, white coveralls or white or yellow rain gear shall also be worn. <br />The vests and other apparel shall be in conformance with Section 1-07.8. The <br />Contractor shall furnish the MUTCD standard Stop/Slow paddles, except the minimum <br />width shall be 24-inches, for the flagging operations. During hours of darkness flagger <br />stations shall be illuminated to insure that flaggers can be easily seen without causing
The URL can be used to link to this page
Your browser does not support the video tag.