My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 2 <br />Everett Mall Bus Platform Earthwork December 2024 <br />WO No – MALLSTN/24462 SP-112 <br />Ensure the top six inches of subgrade is free from rocks or cemented lumps larger than <br />2-1/2 inches in greatest dimension. <br />Excavate for curbs and gutters by accurately cutting to the cross-sections, grades, and <br />elevations shown. Take care not to excavate below the specified grades. Maintain all <br />excavations free from accumulation of detrimental quantities of leaves, brush, sticks, <br />trash, and other debris. <br />2-03.3(2) Rock Cuts <br />Delete entire section.” <br />2-03.3(3) Excavation Below Subgrade <br />Supplement 2-03.3(3) by adding the following: <br />Proof Rolling: Proof roll subgrade under the roadway with a fully loaded tandem <br />truck following trench backfilling and grading to subgrade to identify soft or loose <br />areas in the subgrade. In areas where the subgrade does not stand up to the proof <br />roll, over excavate the subgrade and replace with imported Foundation Material <br />Class A or B or Gravel Borrow, as determined by the Engineer, to bring the subgrade <br />up to the proper compaction and grade. Compact backfill material in accordance <br />with 2-03.3(3). <br />2-03.3(7) Disposal of Surplus Material <br />2-03.3(7)C Contractor-Provided Disposal Site <br />Delete the first paragraph of 2-03.3(7)C and substitute the following: <br />Make arrangements for disposal of surplus and other materials. All costs for <br />disposal of surplus and other materials shall be included with the respective <br />Bid items of the Contract with no direct compensation being made. <br />Dispose of Asbestos-cement pipe in accordance with the requirements of the <br />State of Washington Department of Ecology and the Snohomish County Solid <br />Waste Division. <br />2-03.4 Measurement <br />Delete all paragraphs under 2-03.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B - Bid Items Descriptions and provided in Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />2-03.5 Payment <br />Delete all paragraphs under 2-03.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />There will be no direct compensation made for haul on material moved within or from the <br />Project site and the Contractor shall include the cost of hauling in his various unit <br />contract prices. <br />There will be no direct compensation made for “Proof Rolling” as required in this section <br />for excavated portions of the roadway and the Contractor shall include costs in his <br />various unit Contract prices.
The URL can be used to link to this page
Your browser does not support the video tag.