My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 2 <br />Everett Mall Bus Platform Earthwork December 2024 <br />WO No – MALLSTN/24462 SP-113 <br />Payment for over excavation below subgrade and disposal of over excavated materials <br />as required in this section shall be included in the Bid item for Foundation Material. <br />Imported material required in this section shall be paid for by the unit Bid price for that <br />material. Payment for placement and compaction of import material shall be included in <br />the unit price per ton of import material. <br />2-04 HAUL <br />2-04.1 Description <br />Delete the first paragraph of 2-04.1 and substitute the following: <br />This Work shall consist of transporting excavated material from its original site to its final <br />place on the Project or to a Contractor arranged waste site. <br />2-04.3 Vacant <br />Revise 2-04.3 to read as follows: <br />2-04.3 Construction Requirements <br />Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br />driveways, trails, sidewalks or parking lots not being improved in the Contract. <br />2-04.4 Measurement <br />Revise 2-04.4 to read as follows: <br />Haul work will not be measured. <br />2-04.5 Payment <br />Revise 2-04.5 to read as follows: <br />All costs for the Work described in Section 2-04 shall be included with excavation work <br />with no direct compensation made. <br />2-06 SUBGRADE PREPARATION <br />Supplement 02-06 by adding the following: <br />The contractor will prepare the subgrade by rough grading and compacting it to 95% <br />compaction so it is ready for placement of base materials. See Division B for measurement <br />and payment of “Site Grading” <br />2-07 WATERING <br />2-07.3 Construction Requirements <br />Supplement 2-07.3 by adding the following: <br />Only Everett Public Works Department Water Division personnel and the Project <br />Inspector may authorize the operation of City fire hydrants or making connections to City <br />water mains. Upon obtaining City permission, the following shall apply: <br />1. Use only those agency designated hydrants in strict accordance with City’s <br />requirements for hydrant use. Obtain a temporary hydrant permit from the City’s <br />Public Works Department Water Division. Temporary hydrant permits are <br />available for a $1,200.00 deposit by contacting the City of Everett’s Utility Billing <br />at 425-257-8999 from 8:00 a.m. to 5:00 p.m. Monday through Friday. Deposit is <br />refundable. Provide backflow prevention assembly approved by the City.
The URL can be used to link to this page
Your browser does not support the video tag.