My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6600 EVERGREEN WAY 2023 Plans 2025-04-07
>
Address Records
>
EVERGREEN WAY
>
6600
>
Plans
>
6600 EVERGREEN WAY 2023 Plans 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 2:35:53 PM
Creation date
4/7/2025 2:35:23 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6600
Permit
K2310-015
Year
2023
Notes
NEW ANSUL UL300 FIRE SUPPRESSION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: <br /> 1.SYSTEM SHALL BE PRE-ENGINEERED <br /> — TO NOZZLES <br /> 2.SYSTEM SHALL BE MANUFACTURED BY ANSUL INC. <br /> 3.ANSUL R102 SYSTEMS HAVE THE FOLLOWING LISTINGS AND APPROVALS: TO PULL STATION(MOUNT TO CODE) <br /> UNDERWRITERS LABORATORIES INC, UL 300 / UL 1254, UL EX 3470 <br /> 4.SYSTEM TEMPERATURE LIMITATIONS 32F MIN / 120F MAX TO DETECTORS <br /> S.INSTALLATION REQUIREMENTS, NOZZLE LIMITATIONS AND DESIGN TO GAS VALVE <br /> CRITERIA SHALL COMPLY WITH THE ANSUL R102 MANUAL AND ALL <br /> ADDENDUMS AS PUBLISHED BY ANSUL <br /> 6.PIPE AND FITTINGS SHALL BE SCHEDULE 40 BLACK, CHROME PLATED OR <br /> STAINLESS. GALVANIZED PIPE SHALL NOT BE USED. <br /> 7.ALL REQUIRED ELECTRICAL WORK SHALL BE PERFORMED BY OTHERS AND a <br /> IS NOT INCLUDED ON THIS SHOP DRAWING. <br /> 8.ALL REQUIRED PLUMBING WORK BE PERFORMED BY OTHERS AND IS NOT <br /> INCLUDED ON THIS SHOP DRAWING <br /> General Piping Requirements <br /> 1.All R-102 system piping is straight line.Therefore,the need for 6.All distribution piping must be 3/8 in.Schedule 40 black iron, 6 GAL. MAN I F O L D E D SYSTEM DETAIL <br /> critical lengths and balancing is minimized. chrome-plated,or stainless steel.Do not use hot dipped gal- <br /> 2 Two 450 elbows count as one 90°elbow. vanized pipe on the distribution piping. N.T.S . <br /> 7. All threaded connections located in and above the protected <br /> 3.Each branch line includes the tee or elbow leading to it,and area must be sealed with pipe tape.Tape should be applied to <br /> all fittings within the branch line itself. male threads only.Make certain tape does not extend over the <br /> 4.The minimum piping length of Schedule 40,3/8 in.pipe from end of the thread,as this could cause possible blockage of the <br /> the tank outlet to any nozzle protecting a range,fryer,or wok agent distribution. <br /> must be 6 ft.(1.8 m). 8. Before installing blow-off caps on nozzles, apply a small <br /> 5.Pipe lengths are measured from center of fitting to center of amount of Dow Corning No. 111 silicone grease across the "EjPYE• <br /> fitting.See Figure 85. opeing in the nozzle tip and also a small amount coating the BARKER <br /> exterior of the blow-off cap.This will help keep cooking grease tAge <br /> CENTER TO CENTER� from building up on the cap. " ��"„.1,1 ", <br /> 9. Tees used in the distribution piping in can be used as thru tees, LUNA MEXICAN RESTAURANT <br /> side outlet tees,or bull tees. 6600 EVERGREEN WAY <br /> EVERETT, WA 98203 <br /> 735 E. FAIRHAVEN AVE. SIZE DWG No DWG REV <br /> FIGURE 85 BURLINGTON, WA 98233 KITCHEN FIRE SYSTEM 1 <br /> Ana <br /> (360) 755-5444 SCALE N/A 11/17/2023 SHEET 2 OF 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.