Laserfiche WebLink
INTERNALLY SUBDIVIDE THE BINDER CONTENTS WITH PERMANENT PAGE DIVIDERS,ORGANIZED BY MAJOR DUCTWORK FABRICATION �� <br /> GENERAL MECHANICAL REQUIREMENTS EQUIPMENT/SYSTEMS(I.E.FANS,ETC.) EXTRA WORK JEDA DESIGNS <br /> CONTENTS: EACH VOLUME OF O&MNAMES, <br /> MANUAL SHALL HAVE THREE PARTS: VERFOR ANY EXTRA WORK WHICH MAY BE PROPOSED,THE CONTRACTOR SHALL FURNISH TO THE GENERAL HEIFY CK PLANSDIMENSIONS <br /> SHOWI G WORKSITE, <br /> OF OTHER TRADES AND CONSULTWATH DRAWINGS <br /> A ARCHITECT AND/OR ENGINEER FABRICATION <br /> THE EVENAND OF ANON. —� <br /> DESCRIPTION OF WORK PART 1: A DIRECTORY LISTING NAMES,ADDRESSES,AND TELEPHONE NUMBERS OF ARCHITECT/ENGINEER,CONTRACTOR, <br /> SUBCONTRACTORS,AND MAJOR EQUIPMENT SUPPLIERS. CONTRACTOR/CONSTRUCTION MANAGER,AN ITEMIZED BREAKDOWN OF THE ESTIMATED COST OF ALL MATERIALS AND LABOR INTERFERENCES. DESIGNING THE FUTURE <br /> THIS DIVISION INCLUDES ALL LABOR,MATERIALS,EQUIPMENT,TOOLS,SUPERVISION,START-UP SERVICES,OWNER TRAINING, PART 2: 0&M DATA,ARRANGED AND SUBDIVIDED BY MAJOR EQUIPMENT/SYSTEMS. FOR EACH CATEGORY,IDENTIFY NAMES, REQUIRED TO COMPLETE THIS WORK.THE ESTIMATE COST BREAKDOWN SHALL INCLUDE UNIT PRICES(SAME PRICES FOR <br /> ETC.,INCLUDING ALL INCIDENTAL AND RELATED ITEMS,NECESSARY TO COMPLETE INSTALLATION AND SUCCESSFULLY TEST AND ADDRESSES,AND TELEPHONE NUMBERS OF SUBCONTRACTORS AND SUPPLIERS: INCREASE/DECREASE OF WORK)FOR ALL MATERIALS(I.E.DUCT,PIPING,VALVES,EQUIPMENT,EQUIPMENT RENTAL,ETC.)AND FABRICATE NECESSARY OFFSETS AND TRANSITIONS TO AVOID INTERFERENCE WITH BUILDING CONSTRUCTION,PIPING,EQUIPMENT, <br /> START UP AND OPERATE THE MECHANICAL SYSTEMS INDICATED ON THE DRAWINGS. LIST OF EQUIPMENT. ALL LABOR(I.E.MANHOURS,OVERTIME,ETC.)WHICH MAY BE REQUIRED FOR ANY PROPOSED EXTRA WORK.THE CONTRACTOR ETC.MAKE CHANGES,OFFSETS,ETC.FOR DUCT OBSTRUCTIONS PER SMACNA HVAC DUCT CONSTRUCTION STANDARDS OR <br /> THE CONTRACTOR,AND HIS SUBCONTRACTORS AND SUPPLIERS,SHALL INCLUDE IN HIS BID ALL MATERIALS,LABOR,AND COPIES OF SHOP DRAWINGS AND PRODUCT DATA,APPROVED BY ARCHITECT/ENGINEER. SHALL NOT PROCEED UNTIL RECEIVING A WRITTEN ORDER FROM THE GENERAL CONTRACTOR ESTABLISHING THE AGREED PRICE SMACNA INDUSTRIAL DUCT CONSTRUCTION STANDARDS AS REQUIRED BASED UPON PRESSURE CLASS. HOWEVER,DO NOT 140 E.SANTA CLARA ST#13 <br /> EQUIPMENT INVOLVED,IN ACCORDANCE MATH ALL LOCAL CUSTOMS,CODES,RULES,REGULATIONS; AND SECURE COMPLIANCE OF INSTALLATION AND OPERATIONAL PROCEDURES. AND DESCRIBING THE WORK TO BE DONE. REDUCE DUCT TO LESS THAN 6 INCHES IN ANY DIMENSION AND DO NOT EXCEED AN 8:1 ASPECT RATIO.WHERE IT IS ARCADIA,CA 91006 <br /> ALL PARTS OF THE SPECIFICATIONS AND DRAWINGS REGARDLESS OF SECTIONAL INCLUSION IN THESE SPECIFICATIONS. ROUTINE MAINTENANCE PROCEDURES. NECESSARY TO TAKE PIPES,BEAMS,OR OTHER SIMILAR OBSTRUCTIONS THROUGH DUCTS,CONSTRUCT EASEMENT AS INDICATED (626)445-0051 PHONE <br /> THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE COMPLETE AND SATISFACTORY ACCOMPLISHMENT OF ALL WORK TROUBLE SHOOTING PROCEDURES. IN SMACNA HVAC DUCT CONSTRUCTION STANDARDS OR SMACNA INDUSTRIAL DUCT CONSTRUCTION STANDARDS.IN ALL CASES, (626)445-0053 FAX <br /> INCLUSIVE OF WHATEVER MISCELLANEOUS MATERIAL AND/OR APPURTENANCES ARE REQUIRED TO PERFECT THE INSTALLATION, COMPLETE PARTS LISTS BY NOMENCLATURE,MANUFACTURER'S PART NUMBER AND USE. HVAC DUCTS AND CASINGS SEAL TO PREVENT AIR LEAKAGE. <br /> AND DEMONSTRATE THAT ALL ELECTRICAL SYSTEMS WILL OPERATE SATISFACTORILY UNDER NORMAL OPERATING CONDITIONS. RECOMMENDED SPARE PARTS LISTS. FABRICATE DUCTWORK TO PREVENT FAILURE UNDER PRESSURE OR VACUUM CREATED BY FAST CLOSURE OF DUCTWORK <br /> LUBRICATION CHART LISTING ALL TYPES OF LUBRICANTS TO BE USED FOR EACH PIECE OF EQUIPMENT AND THE RECOMMENDED REFERENCE STANDARDS DEVICES. PROVIDE LEAKTIGHT AUTOMATIC RELIEF DEVICES WHERE REQUIRED. <br /> DRAWINGS FREQUENCY OF LUBRICATION. DUCTS OR PLENUMS OF MASONRY CONSTRUCTION ARE NOT ACCEPTABLE. <br /> COMPLETE WIRING AND SCHEMATIC DIAGRAMS. ASTM A 36/A 36M -STANDARD SPECIFICATION FOR CARBON STRUCTURAL STEEL. REPAIR GALVANIZED SURFACES DAMAGED BY THE APPLICATION OF ZINC RICH PAINT PER MANUFACTURER'S INSTRUCTIONS. �PIaEo w&_NTM:�,Eoos-T ss�MrtEp <br /> THE DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL LOCATION AND ARRANGEMENT OF EQUIPMENT,PIPING,DUCTWORK ELEVATIONS AND/OR SECTIONS CUT THROUGH ALL OF THE MAJOR EQUIPMENT AND SUB-ASSEMBLIES. ASTM A 653/A 653M-STANDARD SPECIFICATION FOR STEEL SHEET, ZINC-COATED(GALVANIZED)OR ZINC-IRON e*opNWOLEE�NPARTT`SPRoHaW�.�LEToTANY <br /> HE <br /> AND RELATED ITEMS.THEY SHALL BE FOLLOWED AS CLOSELY AS ELEMENTS OF THE CONSTRUCTION WILL PERMIT.THE AT THE END OF EACH SECTION, A MAINTENANCE SCHEDULE SHALL BE PROVIDED FOR EACH PIECE OF EQUIPMENT. THE ALLOY-COATED(GALVANNEALED)BY THE HOT-DIP PROCESS. CLEANING <br /> CONTRACTOR SHALL PROVIDE/INSTALL ALL MECHANICAL SYSTEMS,AND ASSOCIATED EQUIPMENT,COMPLETE AND INCLUDE ALL SCHEDULE SHALL DISPLAY THE DAILY,WEEKLY,MONTHLY,SEMI-ANNUAL,AND ANNUAL LUBRICATION AND PREVENTATIVE NFPA 90A-STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS; NATIONAL FIRE PROTECTION sveaiicnnais A�OF EEaR"sncro since of <br /> NECESSARY OFFSETS,FITTINGS,AND OTHER COMPONENTS REQUIRED DUE TO INTERFERENCES,SPACE CONSTRAINTS,CODE MAINTENANCE REQUIRED IN ORDER TO MEET WARRANTY CONDITIONS AND THE MANUFACTURER'S RECOMMENDATIONS FOR CLEAN DUCT SYSTEM AND FORCE AIR E HIGH VELOCITY THROUGH DUCT TO REMOVE ACCUMULATED DUST. TO OBTAIN E^ <br /> ASSOCIATION. SUFFICIENT AIR,CLEAN HALF THE SYSTEM AT A TIME.PROTECT EQUIPMENT THAT COULD BE HARMED BY EXCESSIVE DIRT WITH COPYRIGHT <br /> REQUIREMENTS,ETC.AS REQUIRED TO PROVIDE A COMPLETE/FUNCTIONAL SYSTEM. OPTIMAL PERFORMANCE AND LIFE OF THE EQUIPMENT.PHOTOS OR REPRODUCTION OF THE MANUFACTURER'S LITERATURE WILL NFPA 90B-STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR CONDITIONING SYSTEMS; NATIONAL FIRE TEMPORARY FILTERS,OR BYPASS DURING CLEANING. JEDA DESIGNS 2001 <br /> THE GENERAL MECHANICAL REQUIREMENTS ARE INTENDED TO AUGMENT THE DRAWINGS AND SPECIFICATIONS.SHOULD NOT BE ACCEPTED. PROTECTION ASSOCIATION. <br /> CONFLICTS OCCUR BETWEEN THE DRAWINGS AND THE SPECIFICATIONS,THE STRICTEST PROVISION SHALL GOVERN. WHERE THERE PART 3: PROJECT DOCUMENTS AND CERTIFICATES,INCLUDING THE FOLLOWING: NFPA 96-STANDARD FOR VENTILATION CONTROL AND FIRE PROTECTION OF COMMERCIAL COOKING OPERATIONS; NATIONAL INSULATION AND FLEXIBLE DUCTWORK <br /> ARE CONFLICTS OR DIFFERENCES BETWEEN THE DRAWINGS FOR THE VARIOUS TRADES,REPORT SUCH CONFLICTS OR WARRANTY CERTIFICATES. FIRE PROTECTION ASSOCIATION. <br /> DIFFERENCES TO THE ARCHITECT AND/OR ENGINEER FOR RESOLUTION. COPIES OF APPROVED CONSTRUCTION PERMITS. SMACNA(LEAK)-HVAC AIR DUCT LEAKAGE TEST MANUAL; SHEET METAL AND AIR CONDITIONING CONTRACTORS'NATIONAL INSULATED,FACTORY FABRICATED,FLEXIBLE DUCTWORK MAY BE UTILIZED AT RUNOUTS TO AIR DIFFUSERS.FLEXIBLE DUCTWORK 11109 REGISTERED <br /> THE CONTRACTOR SHALL EXAMINE THE DRAWINGS OF ALL OTHER TRADES IN ORDER TO VERIFY THE CONDITIONS GOVERNING A MINIMUM OF TWO(2)COPIES OF ALL APPROVED OPERATION AND MAINTENANCE LITERATURE SHALL BE FURNISHED TO THE ASSOCIATION. SHALL CONSIST OF AN EXTERIOR REINFORCED LAMINATED VAPOR BARRIER,1.5"FIBERGLASS INSULATION AND INTERIOR VINYL ARCHITECT <br /> THE WORK ON THE JOB SITE.ARRANGE WORK ACCORDINGLY,PROVIDING ALL DUCTWORK,PIPING,FITTINGS,TRAPS,VALVES AND OWNER WATHIN 10 DAYS AFTER FINAL INSPECTION.O&M MANUALS MUST BE COMPLETED PRIOR TO START OF OWNER TRAINING SMACNA(DCS)-HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE; SHEET METAL AND AIR CONDITIONING LINER WITH SPRING STEEL WIRE HELIX.FIBERGLASS INSULATION SHALL HAVE A MAXIMUM CONDUCTIVITY,K-VALUE,OF 0.25 AT V <br /> ACCESSORIES AS MAY BE REQUIRED TO MEET SUCH CONDITIONS. AS THE MANUALS SHALL BE USED AS THE BASIS OF THE TRAINING. CONTRACTORS'NATIONAL ASSOCIATION. 757.VINYL LINER SHALL NOT BE PERFORATED.FLEXIBLE DUCT ASSEMBLY SHALL HAVE A FLAME SPREAD/SMOKE DEVELOPED DUANE L. BRENNEISE <br /> DEVIATIONS FROM THE DRAWANGS,WITH THE EXCEPTION OF MINOR CHANGES IN ROUTING AND OTHER SUCH INCIDENTAL <br /> CHANGES THAT DO NOT AFFECT THE FUNCTIONING OR SERVICEABILITY OF THE SYSTEMS,SHALL NOT BE MADE WITHOUT THE SHOP DRAW TUGS SUBMITTALS RATING OF 25/50 OR LESS.FLEXIBLE DUCT TO FLEXIBLE DUCT CONNECTIONS SHALL BE MADE WITH FACTORY FABRICATED STATE OF WASHINGTON <br /> / SUBMITTALS STEEL COLLARS.FLEXIBLE DUCT SHALL BE SECURED TO RIGID DUCTWORK AND AIR DEVICES W9TH SCREWS AND DRAWBANDS. �� <br /> WRITTEN AR APPROVAL OF THE ARCHITECT AND/OR ENGINEER. LENGTH OF FLEXIBLE DUCTWORK SHALL BE LIMITED TO 5'AND SHALL NOT BE COMPRESSED.FLEXIBLE DUCTWORK SHALL NOT <br /> THE ARCHITECTURAL AND STRUCTURAL DRAWINGS TAKE PRECEDENCE IN ALL MATTERS PERTAINING TO THE BUILDING REFER TO GENERAL CONDITIONS AND SUPPLEMENTARY GENERAL CONDITIONS. PRODUCT DATA: PROVIDE DATA FOR DUCT MATERIALS AND DUCT CONNECTIONS. BE USED FOR ELBOWS.FLEXIBLE DUCT SHALL NOT BE USED ABOVE INACCESSIBLE CEILINGS.FLEXIBLE DUCT SHALL NOT PASS SLAL <br /> STRUCTURE,MECHANICAL DRAWINGS IN ALL MATTERS PERTAINING TO MECHANICAL TRADES AND ELECTRICAL DRAWINGS IN ALL ALL SHOP DRAWINGS AND EQUIPMENT SUBMITTALS SHALL BE SUBMITTED AS A COMPLETE PACKAGE,NOT piecemeal.ALL PROJECT RECORD DOCUMENTS: RECORD ACTUAL LOCATIONS OF DUCTS AND DUCT FITTINGS.RECORD CHANGES IN FITTING <br /> MATTERS PERTAINING TO ELECTRICAL TRADES.WHERE THERE ARE CONFLICTS OR DIFFERENCES BETWEEN THE DRAWINGS FOR SUBMITTALS SUBMITTED INDIVIDUALLY SHALL BE RETURNED UNCHECKED.EXCEPTIONS TO THIS ONLY SHALL INCLUDE LONG LEAD LOCATION AND TYPE. SHOW ADDITIONAL FITTINGS USED. THROUGH WALLS.FLEX DUCTS SHALL BE LISTED AND LABELED.INSTALL ACCORDING TO THE LISTING,MANUFACTURER'S <br /> THE VARIOUS TRADES,REPORT SUCH CONFLICTS OR DIFFERENCES TO THE ARCHITECT AND/OR ENGINEER FOR RESOLUTION. ITEMS. RECOMMENDATIONS,USING APPROVED HANGERS AND FITTINGS. J`� AWAH 4 <br /> QUALITY ASSURANCE SUPPLY AIR DUCTWORK SHALL BE INSULATED WITH 1.5"THICK,0.75 LB/CF DENSITY FLEXIBLE FIBERGLASS WATH FOIL SCRIM mI: c <br /> COORDINATION OF WORK UNLESS NOTED VALVOTHES, <br /> PLUMBING <br /> SUBMIT DIGITAL(.SPECIALTIES, <br /> FORMAT)COPIES OF COMPLETE MANUFACTURER'S SHOP DRAWINGS FOR ALL FACING. INSULATION SHALL HAVE A MAXIMUM CONDUCTIVITY,K-VALUE,OF 0.29 AT 75F AND HAVE FLAME SPREAD/SMOKE <br /> EQUIPMENT,VALVES,PLUMBING AND HEATING SPECIALTIES,REFRIGERATION SPECIALTIES,PIPE HANGERS, WRING DIAGRAMS AND MANUFACTURER QUALIFICATIONS: COMPANY SPECIALIZING IN MANUFACTURING THE TYPE OF PRODUCTS SPECIFIED IN THIS <br /> THE CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS OF ALL ELECTRICAL AND MECHANICAL EQUIPMENT/SYSTEMS PRIOR CONTROL DIAGRAMS. WHERE ITEMS ARE REFERRED TO BY SYMBOLIC DESIGNATION ON THE DRAWINGS AND SPECIFICATIONS,ALL SECTION,WITH MINIMUM 10 YEARS OF DOCUMENTED EXPERIENCE. DEVELOPED RATING OF 25/50 OR LESS. INSULATION SHALL BE SECURED WITH WIRE TIES AT 12"ON CENTER OR WITH / 45 <br /> TO THE INSTALLATION OF ANY NEW WORK. MECHANICAL EQUIPMENT,DUCTWORK,SYSTEMS,ETC.SHALL NOT INTERFERE WITH SUBMITTALS SHALL BEAR THE SAME DESIGNATION.REFER TO OTHER SECTIONS OF THE MECHANICAL SPECIFICATIONS FOR INSTALLER QUALIFICATIONS: COMPANY SPECIALIZING IN PERFORMING THE TYPE OF WORK SPECIFIED IN THIS SECTION,WITH SELF-SEALING LAP AND TAPE JOINTS 3"ON CENTER AT FITTINGS.JOINTS SHALL BE COVERED WITH 3"WIDE FOIL REINFORCED W L <br /> MECHANICAL EQUIPMENT SPACES OR ELECTRICAL CLEARANCES. THE CONTRACTOR SHALL COORDINATE HIS WORK TO OBTAIN ADDITIONAL REQUIREMENTS. MINIMUM 10 YEARS OF DOCUMENTED EXPERIENCE. KRAFT TAPE.ADHESIVE OR MECHANICAL FASTENERS SHALL BE USED WHERE NECESSARY TO PREVENT SAGGING.VAPOR fssroNA �`�' <br /> SYMMETRY IN CEILING LAYOUTS,SO THAT LIGHTS,GRILLS,ETC.ARE COORDINATED AND ARE INSTALLED PER THE BARRIER PENETRATIONS BY MECHANICAL FASTENERS SHALL BE SEALED WITH VAPOR BARRIER ADHESIVE.INSULATION SHALL 01-24-2023 <br /> ARCHITECTURAL REFLECTED CEILING PLAN AND INTERIOR ELEVATIONS. REGULATORY REQUIREMENTS STOP AND POINT AROUND ACCESS DOORS AND DAMPER OPERATORS TO ALLOW OPERATION WITHOUT DISTURBING WRAPPING. SEAL: <br /> THE CONTRACTOR AND HIS SUBCONTRACTORS SHALL BE RESPONSIBLE FOR ALL TASKS APPLICABLE TO THEIR WORK IN RECORD DRAWINGS THE DUCT INSULATION SHALL MEET THE FOLLOWING TABLE. <br /> ACCORDANCE WITH THE SPECIFICATIONS,DRAWINGS,AND CODE REQUIREMENTS,AND SHALL BE RESPONSIBLE FOR CONSTRUCT DUCTWORK TO SMACNA,NFPA 90A,NFPA 90B,AND NFPA 96 STANDARDS. <br /> COORDINATING LOCATIONS AND ARRANGEMENTS OF THEIR WORK TO GIVE BEST RESULTS WITH ALL OTHER RELEVANT TRADES. CONTRACTOR SHALL SUBMIT TO THE ARCHITECT AND/OR ENGINEER,RECORD DRAWINGS WHICH HAVE BEEN NEATLY MARKED TO <br /> COORDINATE ALL WALL,ROOF,FLOOR PENETRATIONS,EQUIPMENT PADS,EQUIPMENT LOCATIONS,SYSTEM ROUTINGS,ETC. 'NTH REPRESENT AS-BUILT CONDITIONS FOR ALL NEW MECHANICAL WORK. FIELD CONDITIONS DUCT INSULATION <br /> ARCHITECTURAL AND STRUCTURAL TRADES. THE CONTRACTOR SHALL KEEP ACCURATE NOTE OF ALL DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS AND <br /> VERIFY REQUIREMENTS OF ALL EQUIPMENT NTH SHOP DRAWING SUBMITTALS PRIOR TO INSTALLATION-NOTIFY ARCHITECT DISCREPANCIES IN THE CONCEALED CONDITIONS AND OTHER ITEMS OF CONSTRUCTION ON FIELD DRAWINGS AS THEY OCCUR. DO NOT INSTALL DUCT SEALANTS WHEN TEMPERATURES ARE LESS THAN THOSE RECOMMENDED BY SEALANT MANUFACTURERS. DUCT EXPOSED WITHIN BUILDING <br /> AND/OR ENGINEER OF ANY CONFLICTS BETWEEN SHOP DRAWINGS AND PLANS. THE MARKED UP FIELD DOCUMENTS SHALL BE AVAILABLE FOR REVIEW BY THE ARCHITECT AND/OR ENGINEER,AND OWNER AT MAINTAIN TEMPERATURES WITHIN ACCEPTABLE RANGE DURING AND AFTER INSTALLATION OF DUCT SEALANTS. TYPE OF DUCT IN SPACE BEING OUTSIDE/ATTIC ENVELOPE AND <br /> COORDINATE LOCATIONS OF MECHANICAL ITEMS THAT REQUIRE ACCESS(I.E.DAMPER ACTUATORS,EXHAUST FANS,ETC.)NTH THEIR REQUEST. SERVED BELOW ATTIC <br /> REFLECTED CEILING PLAN.ITEMS LOCATED ABOVE HARD NON-ACCESSIBLE CEILINGS SHALL BE PROVIDED'NTH ACCESS DOORS COORDINATION REQUIREMENTS <br /> AS REQUIRED. SUPPLY NONE R-12 R-6 <br /> VERIFY CLEARANCE REQUIREMENTS OF ALL ELECTRICAL AND MECHANICAL EQUIPMENT/SYSTEMS PRIOR TO THE INSTALLATION OF PRODUCTS AND EXECUTION SHEET METAL TRADES SHALL COORDINATE ALL DESIGN,CONSTRUCTION,AND INSTALLATION 'NTH ALL OTHER TRADES. Uj <br /> ANY NEW WORK.MECHANICAL EQUIPMENT,PIPING,DUCTWORK, SYSTEMS,ETC.SHALL NOT INTERFERE WITH ELECTRICAL COORDINATE PAINTING REQUIREMENTS OF EXPOSED DUCTWORK IN FINISHED AREAS WITH SPECIFICATION SECTION 09900 AND RETURN NONE R-12 R-6 z <br /> EQUIPMENT SPACES.ELECTRICAL CONDUIT AND EQUIPMENT CLEARANCES SHALL NOT INTERFERE WITH MECHANICAL EQUIPMENT INSTALLATION OF EQUIPMENT COLOR WITH ARCHITECT. I G <br /> SPACES. EXHAUST NONE NONE NONE � ro <br /> INSTALL EQUIPMENT IN STRICT ACCORDANCE WITH ALL DIRECTIONS AND RECOMMENDATIONS FURNISHED BY THE MANUFACTURER. DESIGN REQUIREMENTS 0 <br /> INSPECTION OF SITE AND PROJECT DOCUMENTATION WHERE SUCH DIRECTIONS ARE IN CONFLICT IWTH THE DRAWINGS AND SPECIFICATIONS, REPORT SUCH CONFLICTS TO THE O u <br /> ARCHITECT AND/OR ENGINEER FOR RESOLUTION. DUCT SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. FOR LINED DUCTS,MAINTAIN SIZES INSIDE LINING. FOR TYPE OF INSULATION REFER TO SPECIFICATIONS. 2 <br /> THE CONTRACTOR SHALL VISIT THE SITE AND EXAMINE/VERIFY THE CONDITIONS UNDER WHICH THE WORK MUST BE CONDUCTED NO VARIATION OF DUCT CONFIGURATION OR SIZES PERMITTED EXCEPT BY WRITTEN PERMISSION.SIZE ROUND DUCTS INSTALLEDo <br /> BEFORE SUBMITTING PROPOSAL.THE CONTRACTOR SHALL EXAMINE THE DRA'NNGS AND SPECIFICATIONS OF ALL OTHER TRADES WORK INVOLVING OTHER TRADES IN PLACE OF RECTANGULAR DUCTS IN ACCORDANCE'NTH ASHRAE TABLE OF EQUIVALENT RECTANGULAR AND ROUND DUCTS. <br /> INCLUDING MECHANICAL,ARCHITECTURAL,STRUCTURAL AND ELECTRICAL. USE MATERIAL,WEIGHT,THICKNESS,GAUGE,CONSTRUCTION AND INSTALLATION METHODS AS OUTLINED IN THE LATEST ADDITION TESTING AND BALANCING AIR DISTRIBUTION SYSTEMS I <br /> THE SUBMITTING OF A PROPOSAL IMPLIES THAT THE CONTRACTOR HAS VISITED THE SITE,EXAMINED ALL CONTRACT CERTAIN ITEMS OF EQUIPMENT OR MATERIALS SPECIFIED IN THE MECHANICAL DIVISION MAY HAVE TO BE INSTALLED BY OTHER OF THE FOLLOWING SMACNA PUBLICATIONS,UNLESS NOTED OTHERWISE: z <br /> DOCUMENTS, AND UNDERSTANDS THE CONDITIONS UNDER WHICH THE WORK MUST BE CONDUCTED. TRADES DUE TO CODE REQUIREMENTS OR UNION JURISDICTIONAL REQUIREMENTS.IN SUCH INSTANCES,THE CONTRACTOR SHALL HVAC DUCT CONSTRUCTION STANDARDS,METAL AND FLEXIBLE PROVIDE AND SUBMIT AN INDIVIDUAL REPORT FOR EACH AIR DISTRIBUTION SYSTEMS INCLUDING SUPPLY/RETURN AIR SYSTEMS, 9 <br /> THE CONTRACTOR SHALL NOTIFY THE ARCHITECT AND/OR ENGINEER,PRIOR TO SUBMITTING HIS BID VIA REQUEST FOR COMPLETE THE WORK THROUGH AN APPROVED,QUALIFIED SUBCONTRACTOR AND SHALL INCLUDE THE FULL COST FOR SAME IN HVAC AIR DUCT LEAKAGE TEST MANUAL AIR TERMINALS, AIR HANDLING UNITS,TERMINAL UNITS,DIFFUSERS AND GRILLES,EXHAUST/SUPPLY/RETURN FANS,ETC. THE I <br /> INFORMATION(RFl),OF ANY POTENTIAL PROBLEMS THAT HE HAS IDENTIFIED DURING HIS INSPECTION OF THE SITE OR FROM HIS BID. HVAC SYSTEMS-DUCT DESIGN REPORTS SHALL PROVIDE TEST METHODS AND INSTRUMENTS USED INCLUDING LAST TIME OF CALIBRATION OF TESTING <br /> RECTANGULAR INDUSTRIAL DUCT CONSTRUCTION EQUIPMENT,READINGS,PRESSURE DROPS AND TEMPERATURES,EQUIPMENT RPM'S,MOTOR AMPERAGES,AIR QUANTITIES FOR N <br /> THE RENEW OF PLANS/SPECIFICATIONS.RFlS MUST BE SUBMITTED AT LEAST 5 WORKING DAYS PRIOR TO BID OPENING. ROUND INDUSTRIAL DUCT CONSTRUCTION o <br /> COORDINATION EACH OUTLET,SUPPLY,RETURN AND AIR BALANCING PROBLEMS ENCOUNTERED AND SUGGESTIONS. REPORTS SHALL BE ' <br /> USE PRODUCTS WHICH CONFORM TO NFPA 90A,POSSESSING A FLAME SPREAD RATING OF LESS THAN 25 AND A SMOKE SUBMITTED TO THE ARCHITECT AND SHALL INCLUDE DATA ON TESTS USING AABC/NEBB FORMS. REPORTS SHALL INCLUDE FAN N a N <br /> GENERAL SUPPORT REQUIREMENTS INSTALL WORK TO AVOID INTERFERENCE WATH WORK OF OTHER TRADES INCLUDING,BUT NOT LIMITED TO,ARCHITECTURAL AND DEVELOPED RATING OF LESS THAN 50. CURVES FOR THE FINAL SPEEDS DEVELOPED FROM THE FAN MANUFACTURER'S PERFORMANCE TEST DATA FOR ALL FANS 1 HP O cl <br /> PROVIDE ALL NECESSARY ANGLE BRACKETS,HANGERS,OR SUPPLEMENTARY SUPPORTING STEEL AS REQUIRED FOR ADEQUATE ELECTRICAL TRADES. REMOVE AND RELOCATE ANY WORK THAT CAUSES AN INTERFERENCE AT CONTRACTOR'S EXPENSE. AND ABOVE.PROVIDE A 11x17 REDUCED SET OF DRAWINGS SHOWING ALL EQUIPMENT,FLOW DEVICES,TERMINALS MARKED THAT IT()SUPPORT FOR ALL PIPING,DUCTWORK,AND EQUIPMENT.SECURE APPROVAL FORM ARCHITECT AND/OR STRUCTURAL ENGINEER, DISPUTES REGARDING THE CAUSE OF AN INTERFERENCE SHALL BE RESOLVED BY THE ARCHITECT AND/OR ENGINEER. PRESSURE DEFINITIONSCORRESPONDS TO WRITTEN REPORT. > <br /> IN WRITING,BEFORE WELDING OR BOLTING TO STEEL FRAMING OR ANCHORING TO CONCRETE STRUCTURE,OR CUTTING/CORING LOW PRESSURE DUCTWORK: UP TO 2 INCHES WG AND VELOCITIES LESS THAN 1,500 FPM.CONSTRUCT FOR 2 INCH WG POSITIVE ALL AIR DISTRIBUTION SYSTEMS INSTALLED OR REVISED UNDER THIS CONTRACT SHALL BE BALANCED UNDER THIS CONTRACT. <br /> THRU STRUCTURAL SYSTEMS. SEALING OF MECHANICAL OPENINGS AND NEGATIVE OR POSITIVE STATIC PRESSURES. THE MECHANICAL CONTRACTOR SHALL PROCURE THE SERVICES OF AN INDEPENDENT TESTING AND BALANCING AGENCY AND <br /> WHERE PIPING,DUCTWORK, W EQUIPMENT IS SUPPORTED RODS <br /> SUSPENDED FROM CONCRETE CONSTRUCTION,PROVIDE APPROVED SEAL THE SPACE AROUND PIPES IN SLEEVES AND AROUND DUCT OPENINGS THROUGH WALLS,FLOORS AND CEILINGS. SHALL NOT ENGAGED IN ENGINEERING DESIGN OR A DIVISION OF THE MECHANICAL CONTRACTOR ENTITY. THE TESTING AND N <br /> METAL DECK,USE RAMSET OR WELDS AS REQUIRED. <br /> CONCRETE INSERTS IN FORMWORK RECEIVE HANGER RODS,SUCH AS UNISTRUT OR POWERSTRUT,AND WHERE INSTALLED IN PROVIDE ADEQUATE CLEARANCE TO ALLOW FOR PROPER DUCT/PIPE MOVEMENT AND SEALING. PRODUCTS BALANCING AGENCY FIRM SHALL BE AABC OR NEBB CERTIFIED AND SHALL HAVE HAD EXPERIENCE ON SIMILAR SIZED PROJECTS NN INSTALL MECHANICAL PIPING SYSTEMS WITH ADEQUATE ANCHORS,GUIDES,EXPANSION LOOPS,ETC.AS REQUIRED TO PROVIDE PROVIDE/INSTALL FIREPROOF WALL AND FLOOR SLEEVES AS REQUIRED BY APPLICABLE BUILDING CODES AT ALL APPLICABLE AND INCLUDED AS PART OF THEIR QUALIFICATIONS SUBMITTED TO THE ARCHITECT FOR REVIEW AND APPROVAL Nm <br /> FOR PIPING EXPANSION/CONTRACTION. WALL,CEILING,AND FLOOR PENETRATIONS.REFER TO ARCHITECTURAL PLANS FOR WALL ASSEMBLY RATINGS. DUCT ASSEMBLIES SUPPLY,RETURN,AND EXHAUST AIR SYSTEMS MUST BE BALANCED USING A VELOMETER TO THE CFM NOTED ON THE -N u u <br /> GUARANTEE CUTTING,CORING AND PATCHING ALL DUCTS: GALVANIZED STEEL,UNLESS OTHERWISE INDICATED. DRAWINGS WITH THE DAMPERS AND REGISTERS SECURELY LOCKED INTO POSITION. DUCT SYSTEM ACCESSORIES SHALL BE - m m <br /> GENERAL EXHAUST: 1 INCH W.G.PRESSURE CLASS,GALVANIZED STEEL. ADJUSTED AND SET FOR THE PROPER AIR FLOW QUANTITIES AND CONDITIONS.FANS,SHEAVES,DAMPERS AND ADJUSTMENT <br /> CONTRACTOR SHALL GUARANTEE THAT ALL LABOR,MATERIALS,AND EQUIPMENT ARE FREE FROM DEFECTS AND AGREES TO REFER TO GENERAL CONDITIONS. MECHANISMS SHALL ADJUSTED AND SET BY CONTRACTOR. <br /> REPLACE OR REPAIR ANY PART OF THIS INSTALLATION WHICH BECOMES DEFECTIVE WITHIN A PERIOD OF ONE YEAR FROM THE UNLESS SPECIFICALLY NOTED OTHERWISE,THE CONTRACTOR SHALL PERFORM ALL CUTTING,CORING,AND PATCHING THAT MAY MATERIALS m <br /> DATE OF SUBSTANTIAL COMPLETION FOLLOWING FINAL ACCEPTANCE.ACCEPTANCE DATE OF SUBSTANTIAL COMPLETION SHALL FOR EXHAUST/SUPPLY/RETURN FANS INCLUDE THE FOLLOWING: m o <br /> BE NECESSARY FOR THE INSTALLATION OF THEIR WORK. ALL CUTTING,CORING,PATCHING AND REPAIR WORK SHALL BE <br /> BE AS DETERMINED BY THE ARCHITECT AND/OR ENGINEER. PERFORMED BY THE CONTRACTOR THROUGH QUALIFIED SUBCONTRACTORS.CONTRACTOR SHALL INCLUDE FULL COST OF SAME IN GENERAL NON-COMBUSTIBLE DUCTS,CONFORMING TO CLASS 1 AIR DUCT MATERIALS,OR UL 181. 1. ADJUST TO CFM SPECIFIED.INCLUDE SHEAVE AND BELTS TO DELIVER AIRFLOW WATHIN LIMITS OF INSTALLED MOTOR 0 3 U <br /> THE CONTRACTOR SHALL FILE WITH THE OWNER ANY AND ALL GUARANTEES FROM THE EQUIPMENT MANUFACTURERS INCLUDING HIS BID. GALVANIZED STEEL DUCTS: ASTM A 653/A 653M GALVANIZED STEEL SHEET,FORMING STEEL(FS)DESIGNATION, NTT HORSEPOWER AND MECHANICAL STRESS LIMITS OF THE FAN FOR BELT DRIVES. � m 1,2. MEASURE STATIC PRESSURES ACROSS FILTERS AND UPSTREAM AND DOWNSTREAM OF FANS. Q 0 = <br /> THE OPERATING CONDITIONS AND PERFORMANCE CAPACITIES THEY ARE BASED ON. SECURE APPROVAL FORM ARCHITECT AND/OR STRUCTURAL ENGINEER,IN WRITING,BEFORE CUTTING,WELDING/BOLTING TO,OR G90/Z275 ZINC COATING. o o U <br /> ANCHORING FROM ANY STRUCTURAL BUILDING COMPONENTS(I.E.STRUCTURAL STEEL,LOAD BEARING WALLS, GASKETS: CHLOROPRENE ELASTOMER,40 DUROMETER, 1/8 INCH THICK,FULL FACE,ONE PIECE VULCANIZED OR DOVETAIL AT 3. REPORT RPM'S OF FANS. <br /> CODES,PERMITS AND FEES FOOTINGS/FOUNDATIONS,CONCRETE FLOORS/CEILINGS,ETC.). JOINTS. 4. PROVIDE NAME PLATE DATA OF FAN AND INCLUDE INLET AND OUTLET SIZES.MEASURE VELOCITIES AT ORIFICES. <br /> ALL REINFORCEMENT FOR DUCTS HAVING A SIDE DIMENSION 48"OR LESS SHALL BE EXTERNAL INTERNAL REINFORCEMENT ALL EXISTING AIR DISTRIBUTION SYSTEMS AFFECTED BY THE WORK UNDER THIS CONTRACT SHALL BE REBALANCED UNDER THIS <br /> REFER ENTIRE SET OF CONTRACT DOCUMENTS,GENERAL CONDITIONS AND SUPPLEMENTARY CONDITIONS. EQUIPMENT CONNECTIONS SHALL BE ACCEPTABLE ONLY FOR DUCTS HAVING A SIDE DIMENSION GREATER THAN 48 INCHES. REINFORCEMENT SHALL BE CONTRACT AS PER THE DRAWINGS(IE IF FAN OR GRO'S SHOW AIR FLOWS). EXISTING VOLUME CONTROL DAMPERS SHALL BE <br /> UNLESS OTHERWISE INDICATED,ALL REQUIRED PERMITS,PLAN REVIEWS,LICENSES,INSPECTIONS,APPROVALS AND FEES FOR PROVIDED PER SMACNA STANDARDS. SET FOR PROPER AIR DISTRIBUTION.EXISTING SYSTEMS WITH ISSUES SHALL BE REPORTED TO THE ENGINEER FOR <br /> MECHANICAL WORK SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR. MAKE CONNECTIONS TO EQUIPMENT,FIXTURES AND OTHER ITEMS INCLUDED IN THE WORK IN ACCORDANCE WITH THE APPROVED STEEL DUCTS-GALVANIZED ROUND AND FIAT OVAL SPIRAL GALVANIZED SHEET STEEL DUCT AND FITTINGS,LOCK FORMING <br /> ALL WORK SHALL BE EXECUTED IN ACCORDANCE WATH THE MOST CURRENT RULES AND REGULATIONS SET FORTH IN LOCAL AND SHOP DRAWINGS AND ROUGH-IN MEASUREMENTS FURNISHED BY THE MANUFACTURES OF THE PARTICULAR EQUIPMENT QUALITY PER ASTM A527,COATING DESIGNATION G-90,FACTORY FABRICATED,LOCK SEAM OR WELDED DESIGN IN ACCORDANCE RECOMMENDATIONS IF AIR FLOWS CANNOT BE ACHIEVED AS INDICATED. <br /> STATE CODES. FURNISHED. WATH SMACNA HVAC DUCT CONSTRUCTON STANDARDS OR SMACNA INDUSTRIAL DUCT CONSTRUCTION STANDARDS AS REQUIRED THE CONTRACTOR AND THE BALANCING FIRM SHALL FURNISH A MINIMUM OF(2)ADJUSTMENTS: ONE FOR THE FIRST COOLING <br /> MECHANICAL AND PLUMBING SYSTEMS SHALL BE INSTALLED PER CURRENT JURISDICTIONAL CODES(INTERNATIONAL MECHANICAL BASED ON PRESSURE CLASS.FLAT OVAL AND ROUND FITTINGS SHALL BE FACTORY FABRICATED WELDED DESIGN.USE OF FIELD SEASON AND ONE FOR THE FIRST HEATING SEASON. <br /> CODE,INTERNATIONAL PLUMBING CODE,INTERNATIONAL FUEL GAS CODE,INTERNATIONAL BUILDING CODE,ETC.),CURRENT NFPA FABRICATED FITTINGS(WELDED DESIGN)SHALL ONLY BE PERMITTED WHEN FACTORY FABRICATED FITTINGS ARE UNAVAILABLE. Q Q Q w <br /> CODES(NFPA 101,NPFA 90,ETC.),AND APPLICABLE SECTIONS OF THE INTERNATIONAL BUILDING CODE. ACCESSIBILITY MANUFACTURERS: DIXI-BILT,SEMCO,LARNE METAL PRODUCTS,UNITED-MCGILL,UNIVARSAL SPIRAL AIR. SET HVAC SYSTEM AIRFLOW RATES WITHIN THE FOLLOWANG TOLERANCES: a/ V CAULK: ELASTOMER CAULK,UL LISTED AND PER NFPA 90A. ¢ Q � Q a/ <br /> WHERE THE DRAWINGS AND/OR SPECIFICATIONS INDICATE MATERIALS OR CONSTRUCTION IN EXCESS OF CODE REQUIREMENTS, � a J <br /> ALL EQUIPMENT SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATION,MAINTENANCE, AND REPAIR,AS SEALANT: INDOOR/OUTDOOR WATER BASED DUCT SEALANT.UL LISTED,NON-TOXIC,WATER RESISTANT,0 SMOKE/FLAME N <br /> THE DRAWINGS AND/OR SPECIFICATIONS SHALL GOVERN.IN THE EVENT THAT THE PLANS AND SPECIFICATIONS CONFLICT VATH SUPPLY,RETURN,AND EXHAUST FANS: PLUS 5 PERCENT TO MINUS 5 PERCENT. w O U a <br /> REQUIRED BY THE EQUIPMENT MANUFACTURER AND AS SUBJECT TO THE APPROVAL OF THE ENGINEER. SPREAD,COMPATIBLE WITH MATING MATERIALS,FOR USE ON ALL SMACNA SEAL CLASS A,B,AND C JOINTS,FOR USE ON 1 2 J O N ,_ <br /> ANY RULES,REGULATIONS,OR CODES APPLYING,SAID RULES,REGULATIONS AND CODES SHALL GOVERN. S 1E , SMACNA PRESSURE CLASSES.USE,F DUCT SEALER ON PVC COATED STEEL DUCTWORK. / AIR OUTLETS AND INLETS: MINUS 10 PERCENT TO MINUS 10 PERCENT. N N 0 <br /> SUBSTITUTION ITEMS REQUIRING PRIOR APPROVAL CLEANING MANUFACTURERS: HARDCAST"DUCT-SEAL#321",FOREMOST"PCD DUCT SEALER" THE FOLLOWING WORK SHALL BE INCLUDED UNDER THIS CONTRACT: <br /> ALL ITEMS THAT THE CONTRACTOR PROPOSED TO USE IN THE WORK THAT ARE NOT SPECIFICALLY NAMED IN THE CONTRACT EACH TRADE SHALL BE RESPONSIBLE FOR REMOVING ALL DEBRIS DAILY AS REQUIRED TO MAINTAIN THE WORK AREA IN A DUCTWORK FABRICATION SUPERVISE AND PERFORM THE BALANCING OF AIR DISTRIBUTION SYSTEMS TO ACHIEVE THE AIR QUANTITIES SPECIFIED AT EACH <br /> DOCUMENTS MUST BE SUBMITTED FOR RENEW.SUCH ITEMS MUST BE SUBMITTED IN DUPLICATE TO THE ARCHITECT AND/OR NEAT,ORDERLY CONDITION. LOW PRESSURE DUCTWORK(+/-2"W.G.STATIC PRESSURE CLASS) AIR INLET, OUTLET AND DAMPER SHOWN ON THE CONTRACT DRAWINGS AT THE PROPER CONDITIONS OF STATIC PRESSURE AND m <br /> ENGINEER FOR APPROVAL A MINIMUM OF TEN(10)DAYS PRIOR TO BID OPENING.REQUESTS FOR PRIOR APPROVAL MUST BE PAINTING FABRICATE AND SUPPORT IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE, AND TEMPERATURE DIFFERENTIAL - <br /> ACCOMPANIED BY COMPLETE CATALOG INFORMATION,INCLUDING BUT NOT LIMITED TO,MODEL,SIZE,ACCESSORIES, COMPLETE AS INDICATED. a <br /> ELECTRICAL INFORMATION AND PERFORMANCE DATA IN THE FORM GIVEN IN THE EQUIPMENT SCHEDULE ON THE DRAWINGS AT ALL MECHANICAL SYSTEMS, EQUIPMENT,PIPING, DUCTWORK,ETC.EXPOSED IN FINISHED AREAS SHALL BE PAINTED TO MATCH PROVIDE DUCT MATERIAL,GAGES,REINFORCING,AND SEALING FOR OPERATING PRESSURES INDICATED. REPORT AND ATTEMPT TO SOLVE ANY NOISE ISSUES DURING TESTING AND BALANCING WITHOUT REDUCING AIRFLOW OR p <br /> WIN STATED DESIGN CONDITIONS. WHERE ITEMS ARE REFERRED TO BY SYMBOLIC DESIGNATIONS ON THE DRAGS,ALL REQUESTS THE SURROUNDING FINISHES.REFER TO SPECIFICATION SECTION 09900- COORDINATE COLOR WITH ARCHITECT. CONSTRUCT T S,BENDS,AND ELBOWS WITH RADIUS OF NOT LESS THAN 1-1/2 TIMES WIDTH OF DUCT ON CENTERLINE.WHERE INCREASING AIRFLOWS GREAT THAN PERCENT LISTED ABOVE. - <br /> FOR PRIOR APPROVAL SHALL BEAR THE SAME DESIGNATIONS. NOT POSSIBLE AND WHERE RECTANGULAR ELBOWS MUST BE USED,PROVIDE AIR FOIL TURNING VANES OF PERFORATED METAL P_ <br /> PROTECTION AND HANDLING OF EQUIPMENT AND MATERIALS WATH GLASS FIBER INSULATION. A SATISFACTORY REPORT SHALL BE RECEIVED BEFORE CONSIDERING THE PROJECT SUBSTANTIALLY COMPLETE.THE TESTING �ov <br /> N (f) <br /> MATERIAL AND EQUIPMENT MANUFACTURERS FABRICATE CONTINUOUSLY WELDED ROUND AND OVAL DUCT FITTINGS IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION AND BALANCING CONTRACTOR SHALL CORRECT ALL DEFICIENCIES WITHIN 7 BUSINESS DAYS OF RECEIVING THE ENGINEER'S z <br /> ELECTRICAL EQUIPMENT FURNISHED BY MECHANICAL TRADES AND INSTALLED BY ELECTRICAL TRADES SHALL BE TURNED OVER STANDARDS-METAL AND FLEXIBLE. REPORT.FAILURE TO COMPLY WILL RESULT IN HOLDING RETAINAGE OF THE FINAL PAYMENT UNTIL SATISFACTION OF ENGINEER. Q J O <br /> ALL ITEMS OF EQUIPMENT SHALL BE FURNISHED COMPLETE WITH ALL ACCESSORIES NORMALLY SUPPLIED WTH THE CATALOG TO ELECTRICAL TRADES IN GOOD CONDITION. USE DOUBLE NUTS AND LOCK WASHERS ON THREADED ROD SUPPORTS. <br /> ITEMS LISTED AND ALL OTHER ACCESSORIES NECESSARY FOR A COMPLETE AND SATISFACTORY OPERATING SYSTEM.ALL EQUIPMENT AND MATERIALS SHALL BE PROTECTED FROM THEFT,INJURY OR DAMAGE. WHERE DUCTS ARE CONNECTED TO EXTERIOR WALL LOUVERS AND DUCT OUTLET IS SMALLER THAN LOUVER FRAME,PROVIDE BALANCE REPORT SHALL BE ON SITE AND ACCESSIBLE TO THE INSPECTOR AT THE TIME OF FINAL MECHANICAL Q �_ <br /> EQUIPMENT AND MATERIALS SHALL BE NEW AND SHALL BE STANDARD PRODUCTS OF MANUFACTURERS REGULARLY ENGAGED IN PROTECT EQUIPMENT OUTLETS,PIPE AND DUCT OPENINGS WITH TEMPORARY PLUGS OR CAPS. BLANK-OUT PANELS SEALING LOUVER AREA AROUND DUCT.USE SAME MATERIAL AS DUCT,PAINTED BLACK ON EXTERIOR SIDE; INSPECTION. NO EXCEPTIONS. <br /> THE PRODUCTION OF PLUMBING,HEATING,VENTILATING AND AIR CONDITIONING EQUIPMENT AND SHALL BE THE PROVIDE ADEQUATE STORAGE FOR ALL EQUIPMENT AND MATERIALS DELIVERED TO THE JOB SITE.EQUIPMENT SET IN PLACE IN SEAL TO LOUVER FRAME AND DUCT. �Np <br /> MANUFACTURER'S LATEST DESIGN. UNPROTECTED AREAS MUST BE PROVIDED WITH TEMPORARY PROTECTION. TEMPERATURE READINGS SHALL BE PROVIDED FOR BOTH SEASONS AND SHALL INCLUDE: ro Z U <br /> IF AN APPROVED MANUFACTURER IS OTHER THAN THE MANUFACTURER USED AS THE BASIS FOR DESIGN,THE EQUIPMENT OF EXECUTION W,m Q lL <br /> PRODUCT PROVIDED SHALL BE EQUAL IN QUALITY,DURABILITY,APPEARANCE,CAPACITY AND EFFICIENCY THROUGH ALL RANGES GENERAL SUPPORT REQUIREMENTS 1. SPACE TEMPERATURE FOR EACH AIR HANDLING HVAC UNIT(DB/WB) <br /> OF OPERATION,SHALL CONFORM WITH ARRANGEMENTS AND SPACE LIMITATIONS OF THE EQUIPMENT SHOWN ON THE PLANS 2. OUTSIDE AIR TEMPERATURES(DB/WB) AND VOLUME w W W <br /> AND/OR SPECIFIED,SHALL BE COMPATIBLE WITH THE OTHER COMPONENTS OF THE SYSTEM AND SHALL COMPLY WITH THE EACH MECHANICAL TRADE SHALL PROVIDE ALL REQUIRED SUPPORTING COMPONENTS TO PROPERLY SUPPORT THEIR WORK. INSTALLATION 3. DISCHARGE AIR TEMPERATURES (DB/WB) N D- <br /> REQUIREMENTS FOR SUBSTITUTION ITEMS REQUIRING PRIOR APPROVAL SPECIFIED IN THIS SECTION OF THE SPECIFICATIONS.ALL SUPPORTING COMPONENTS/SYSTEMS SHALL BE IN ACCORDANCE VWTH CODE AND AS SPECIFIED. 4. SUPPLY FAN CFM AT DUCT DISCHARGE OF UNIT N <br /> INSTALL SUPPORT, AND SEAL DUCTS IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS <br /> COSTS TO MAKE THESE ITEMS OF EQUIPMENT COMPLY WITH THESE REQUIREMENTS INCLUDING,BUT NOT LIMITED TO,PIPING, PROVIDE ALL NECESSARY ANGLE/BRACKETS OR SUPPLEMENTARY STEEL AS REQUIRED FOR ADEQUATE SUPPORT FOR ALL o w In <br /> METAL AND FLEXIBLE. m> <br /> SHEET METAL,ELECTRICAL WORK,AND BUILDING ALTERATIONS SHALL BE INCLUDED IN THE ORIGINAL BID. PIPING,DUCTWORK,SPECIALTIES,AND EQUIPMENT.SECURE APPROVAL FORM ARCHITECT AND OR ENGINEER,IN WRITING,BEFORE - <br /> / INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br /> lit <br /> OPERATION AND MAINTENANCE INSTRUCTIONAL MANUALS WELDING OR BOLTING TO STEEL FRAMING OR ANCHORING TO CONCRETE STRUCTURE. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS. FOR LINED DUCTS,MAINTAIN SIZES INSIDE LINING. 6i <br /> INSTALL AND SEAL METAL AND FLEXIBLE DUCTS IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS- M <br /> DRAWINGS AND MEASUREMENTS METAL AND FLEXIBLE. � z <br /> PROVIDE COMP MAINTENANCE AND OPERATING INSTRUCTIONAL MANUALS COVERING ALL MECHANICAL EQUIPMENT AS COMPETE TE E E VE E EQ E LOCATE DUCTS WITH SUFFICIENT SPACE AROUND EQUIPMENT TO ALLOW NORMAL OPERATING AND MAINTENANCE ACTIVITIES. <br /> SPECIFIED HEREIN,DIVISION 1 REQUIREMENTS,AND INDIVIDUAL EQUIPMENT SPECIFICATION SECTIONS. THESE SPECIFICATIONS AND ACCOMPANYING DRAWINGS ARE INTENDED TO DESCRIBE AND PROVIDE FOR FINISHED WORK.THEY E City of Everett Permit Review o w <br /> THE 0&M DATA SHALL BE BOUND IN A SUITABLE NUMBER OF 3"OR 4",3-RING,HARD COVER BINDERS.PERMANENTLY USE CRIMP JOINTS WITH OR WITHOUT BEAD FOR JOINING ROUND DUCT SIZES 8 INCH AND SMALLER'NTH CRIMP IN DIRECTION <br /> ARE INTENDED TO BE COOPERATIVE,AND WHAT IS CALLED FOR BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE AS OF AIR FLOW EVERETT Status:Reviewed for Permit a N <br /> IMPRINTED ON THE COVER SHALL BE THE WORDS,"MANUFACTURER'S OPERATION AND MAINTENANCE DATA",PROJECT TITLE, BINDING AS IF CALL FOR BY BOTH. THE WORK HEREIN DESCRIBED SHALL BE COMPLETE IN EVERY DETAIL USE DOUBLE NUTS AND LOCK WASHERS ON THREADED ROD SUPPORTS. 09/26/2023 10:32:04 AM <br /> LOCATION OF PROJECT,AND THE DATE.A TABLE OF CONTENTS SHALL BE PROVIDED IN THE FRONT OF EACH BINDER. THE DRAWINGS ARE NOT INTENDED TO BE SCALED FOR ROUGH-IN MEASUREMENTS,NOR TO SERVE AS SHOP DRAWINGS. FIELD PROVIDE FLEXIBLE DUCT CONNECTIONS WHERE DUCTWORK CONNECTS TO FANS,AIR HANDLING EQUIPMENT,AND OTHER <br /> MAINTENANCE AND OPERATING INSTRUCTIONAL MANUALS SHALL BE JOB SPECIFIC TO THIS PROJECT.GENERIC MANUALS ARE MEASUREMENTS NECESSARY FOR ORDERING MATERIALS AND FITTING THE INSTALLATION TO THE BUILDING CONSTRUCTION AND ROTATING EQUIPMENT AND/OR WHERE INDICATED ON THE DRAWINGS. <br /> NOT ACCEPTABLE.EACH PIECE OF EQUIPMENT IN THE 0&M MANUAL SHALL BE IDENTIFIED AS IDENTIFIED ON THE PROJECT ARRANGEMENT SHALL BE TAKEN BY THE CONTRACTOR. THE CONTRACTOR SHALL CHECK LATEST ARCHITECTURAL DRAWINGS TO M -03 <br /> DRAWINGS(I.E.EXHAUST FAN EF-1,ETC.). LOCATE EQUIPMENT/FIXTURES/ETC.,CHECK LATEST STRUCTURAL DRAWINGS FOR INTERFERENCES,ETC.. " <br /> 2 1415 Park Ave.W.,Denver,CO 80205 <br /> p 303.35].1998 <br /> 3consultingengineers.com <br />