My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-22
>
Address Records
>
36TH AVE W
>
5900
>
SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
>
Land Use Decision Documents
>
5900 36TH AVE W SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS Land Use Decision Documents 2025-04-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 9:53:29 AM
Creation date
4/8/2025 3:24:57 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Tenant Name
SEPA 015 - 034 - SOUNDVIEW BUSINESS CAMPUS - VERITAS
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> MEMORANDUM <br /> TO: John Jimerson, Planning Department <br /> FROM: Sabrina Fandler, Engineering/Public Services Department <br /> DATE: 11-20-2015 <br /> SUBJECT: Public Works Comments for BSP 15-003 (W.O. 1571-2015-003) <br /> PROPOSAL: 5 Lot Binding Site Plan for Soundview Business Campus/Veritas <br /> LOCATION: 5900 36th Ave W <br /> A review of this project by the Engineering/Public Services Department indicates that the following <br /> conditions must be met: <br /> 1. Construction permits, inspections and final approvals are required for this project from City of <br /> Everett Permit Services. <br /> 2. A Public Works Permit is required for this project. Detailed drawings in accordance with City <br /> Design and Construction Standards shall be submitted to the Public Works Department, <br /> showing site parking layout, landscaping, utilities, storm drainage, temporary construction <br /> erosion control, and all required improvements in the public right-of-way. Public Works <br /> Department approval of these drawings is required prior to any permits being issued. All <br /> improvements shall be completed, approved and warranted before the Occupancy Permit is <br /> issued/final approval is granted. <br /> 3. The construction plans must be designed from a site survey performed by a licensed State of <br /> Washington land surveyor. <br /> 4. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> 5. All exposed ground must be reseeded within 30 days of the completion of construction. If <br /> reseeding is not practical due to weather or seasonal problems, the ground must be covered with <br /> mulch as directed by the City Engineer. <br /> 6. As-builts of storm sewer, sanitary sewer, and water systems will be required to be submitted per <br /> City Design and Construction Standards and Specifications for Development. <br /> 7. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 8. Special charges for connection to the sewer and water systems in accordance with Ordinance <br /> 3095-08 (codified as EMC 14.08.135) and subsequent revision are applicable. These charges <br /> are based on projected water usage and can be substantial. Applicant is encouraged to obtain a <br /> copy of the Ordinance and determine estimated charges prior to building permit application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.