My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
>
Address Records
>
BROADWAY
>
3726
>
MOUNTAIN PACIFIC BANK
>
3726 BROADWAY MOUNTAIN PACIFIC BANK 2025-04-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 1:47:53 PM
Creation date
4/9/2025 9:16:35 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3726
Tenant Name
MOUNTAIN PACIFIC BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire Department Connection (FDC): <br />PASS FAIL N/A <br />14. Location -Verify on the Approved/Stamped set of plans the approved location of ❑ ❑ ❑ <br />the FDC. Fire Department connection shall be within 75 feet of a fire hydrant and <br />100 feet when work is being done to an existing building. <br />15. Arrangement/Orientation -The FDC shall be assessable and arranged/orientated <br />so a hose line can be attached to the inlets without interference. <br />16. Specifications —The FDC shall bean approved type and comply with the following: <br />• Have two 2 %: fire department inlet connections <br />• Brass (Not Painted) <br />• Have a Schedule 40 galvanized steel post painted red (If not wall mounted) <br />• Couplings shall have swivel fittings with NH internal threads <br />• FDC shall be located 24 to 60 inches above the final grade <br />• Protected from mechanical damage <br />• Supported with a minimum of an 18"x18"x8" concert base <br />• A clear working space not less than 36 inches in width, 36 inches in depth <br />and 78 inches in height shall be provided <br />17. Check Valve -A listed check valve shall be installed in each fire department <br />connection. <br />❑ ❑ ❑ <br />18. Automatic Drip -An automatic drip shall be installed between the check valve and ❑ ❑ ❑ <br />the outside hose coupling in a location that permits inspection and testing and <br />reduces the likelihood of freezing. <br />19. No Shutoff Valve -No shutoff valve shall be permitted in the piping from the fire <br />department connection piping to the point that the fire department connection <br />piping connects to the system piping. <br />Post Indicator Valve (PIV): <br />20. Assessable & Visible - Both Remote Post Indicator Valves and Wall Post Indicator <br />Valves shall be easily accessible, and the Open/Closed indicator shall be visible at <br />all times. <br />21. Remote PIV -Remote Post Indicator Valves shall beset so that the top of the post <br />is 32 to 40 inches above the final grade. <br />22. Wall PIV - Wall Post Indicator Valves are permitted. <br />23. Protection - Post Indicator Valves shall be protected against mechanical damage. <br />❑ ❑ ❑ <br />PASS FAIL N/A <br />❑ ❑ ❑ <br />❑ ❑ ❑ <br />❑ ❑ ❑ <br />Fire Marshal's Office 1425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 <br />4.13.2020 1 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.