2025 Chaplain Blowdown Salvage Timber Sale <br />construction, culvert installation, culvert removal, geotextile installation, drill and shoot, application of 3- <br />inch-minus ballast rock or gravel ballast. Reconstruction consists of reinstalling 18” relief culverts in existing <br />waterbars. <br />SECTION 1 - GENERAL CLAUSES <br />1-1 ROAD PLAN CHANGES: If the Purchaser desires a change from this road plan including, but not limited <br />to relocation, extension, change in design, or adding roads; a revised road plan shall be submitted, in writing, <br />to the Contract Administrator for consideration. The City must approve the submitted plans before road work <br />begins. <br />1-2 UNFORESEEN CONDITIONS: Quantities established in this road plan are minimum acceptable values. <br />Additional quantities required by the City due to unforeseen conditions or Purchaser's choice of construction <br />season or techniques shall be at the Purchaser's expense. Unforeseen conditions include, but are not limited <br />to, solid subsurface rock, subsurface springs, saturated ground, and unstable soils. <br />1-3 ROAD DIMENSIONS: Unless controlled by construction stakes, road work shall be performed in <br />accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within <br />this road plan. <br />1-4 ROAD TOLERANCES: Road work shall be performed within the tolerance listed below. The tolerance <br />class for each road is listed on the TYPICAL SECTION SHEET. <br /> <br />Tolerance Class ft. <br />Road and Subgrade Width (feet) +1.5 <br />Subgrade Elevation (feet +) 0.25 <br />Centerline alignment (feet lt./rt.) 1.0 <br />1-6 ORDER OF PRECEDENCE: Any conflict or inconsistency in the road plan shall be resolved by giving the <br />documents precedence in the following order: <br />1. Permit conditioning. <br />2. Designs or Plans. On designs and plans, figured dimensions shall take precedence over scaled <br />dimensions. <br />3. Road Plan Clauses. <br />4. Typical Section Sheet. <br />In case of any ambiguity or dispute over interpreting the road plan, the Contract Administrator’s or designee’s <br />decision will be final. <br />1-21 HAUL APPROVAL: Purchaser shall not use roads under this Road Plan for hauling, other than timber cut <br />on the right-of-way, without written approval from the Contract administrator. <br />1-25 ACTIVITY TIMING RESTRICTION: The specified activities are not permitted during the listed closure <br />period(s) unless authorized in writing by the Contract Administrator. <br />ROAD STATIONS ACTIVITY CLOSURE PERIOD <br />ALL Rock hauling, construction, or abandonment November 1 to March 30 <br />1-26 OPERATING DURING CLOSURE PERIOD: If permission is granted to operate during a closure period <br />listed in Clause 1-25 ACTIVITY TIMING RESTRICTION the Purchaser shall provide a maintenance plan