My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 13TH ST SEPA 016 - 013 - PRMC NEW CLINIC BUILDING Land Use Decision Documents 2025-04-21
>
Address Records
>
13TH ST
>
1815
>
SEPA 016 - 013 - PRMC NEW CLINIC BUILDING
>
Land Use Decision Documents
>
1815 13TH ST SEPA 016 - 013 - PRMC NEW CLINIC BUILDING Land Use Decision Documents 2025-04-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2025 3:49:54 PM
Creation date
4/14/2025 7:20:12 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1815
Tenant Name
SEPA 016 - 013 - PRMC NEW CLINIC BUILDING
Address Document Type
Land Use Decision Documents
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. Do you know whether applications are pending for governmental approvals or other proposals <br />directly affecting the property covered by your proposal? If yes, explain. <br />There are no applications pending for governmental approvals or other proposals directly affecting the <br />property covered by this proposal. <br />10. List any government approvals or permits that will be needed for your proposal, if known. <br />The following permits/approvals have been identified for this proposal: <br />SEPA Compliance/Threshold Determination........................................................................... City of Everett <br />Review Process II Approval..................................................................................................... City of Everett <br />GradingPermit.......................................................................................................................... City of Everett <br />Building and Demolition Permits............................................................................................. City of Everett <br />BindingSite Plan...................................................................................................................... City of Everett <br />Mechanical and Electrical Permits........................................................................................... City of Everett <br />Water/Sewer Extension............................................................................................................ City of Everett <br />Certificate of Occupancy Permit.............................................................................................. City of Everett <br />Right -of -Way (ROW) Use Permits.......................................................................................... City of Everett <br />National Pollution Discharge Elimination System (NPDES).................. Washington State Dept. of Ecology <br />Air Quality Permit..........................................................................................Puget Sound Clean Air Agency <br />Additional permits may be identified through the permitting process. <br />11. Give brief, complete description of your proposal, including the proposed uses and the size of the <br />project and site. There are several questions later in this checklist that ask you to describe certain <br />aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may <br />modify this form to include additional specific information on project description.). <br />In 2008 a master plan was adopted by the City (Ord. 3090-08) approving plans by Providence Regional <br />Medical Center (PRMC) for its property in North Everett, including the former "community college" <br />property north of 13th Street. The site currently contains the Medical Center's Central Utility Plant and <br />temporary surface parking, both of which were anticipated in the approved master plan. <br />The proposal includes a proposed medical clinic building on the northern portion of the site; the other is <br />additional temporary surface parking to be added west of the existing Central Utility Plant. Both are being <br />constructed in accordance with the 2008 plan. <br />The ultimate master plan is depicted on Figure 3 of City Ordinance 3090-08. The proposed Medical Center <br />will proceed with further implementation of this buildout plan in the coming months. Ultimate buildout <br />will take several years; the two current projects proposed under the action are a part of the 2008 master <br />plan. <br />The clinic facility will be comprised of about 36,600 square feet, occupied mostly by clinical functions <br />with the remainder used for support services with parking below. Additional surface parking will be built <br />immediately adjacent to the west, see Figure I — SEPA Site Plan. The building footprint lies over the <br />location of an existing stormwater detention pond, which will be replaced with an underground vault. <br />Sewer and water utility lines will be relocated to support the future building construction. <br />Environmental Checklist — Providence Regional Medical Center Everett — North Site Page 3 <br />© tiHOCKEI' <br />
The URL can be used to link to this page
Your browser does not support the video tag.