CITY OF EVERETT SPECIAL PROVISIONS
<br />
<br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025
<br />WO No. – UP3529 SP - 8
<br />
<br />work as defined in the Standard Specifications, Standard Drawings, these Specifications,
<br />and as shown on the Contract Plans
<br />
<br />The installation of pump assemblies shall include, but is not limited to, the following:
<br />fabrication, installation of two (2) new Flygt 3127N or approved equal submersible pump
<br />assemblies, frames, discharge assembly, sensors, piping, piping transitions, controls,
<br />conduits, wiring, terminations, controls testing, and other miscellaneous and appurtenant
<br />work.
<br />
<br />Measurement shall be per Each (EA) submersible pump installed as measured upon
<br />completion.
<br />Bid Item 17 - ELECTRICAL, VFD PANEL INSTALL
<br />Measurement and Payment: Lump Sum (LS)
<br />The lump sum bid item for the electrical – Owner Furnished VFDs and Owner Furnished VFD
<br />Panel shall be full compensation for all labor, material, incidentals, tools, and equipment
<br />necessary to satisfactorily complete the work as defined in the Standard Specifications,
<br />Standard Drawings, these specifications, and as shown on the Contract Plans.
<br />
<br />The work shall include, but is not limited to, the following: Owner Furnished Variable
<br />Frequency Drive (VFD) Panel and Owner Furnished VFDs. Conduits, wiring and cabling,
<br />terminations, testing, supports, anchorage, switches, disconnects, grounding, overcurrent
<br />protection devices, metering, panelboards, and other miscellaneous and appurtenant work
<br />required to complete this item of work.
<br />
<br />Measurement and payment for electrical VFDs, VFD panel will be on a lump sum basis,
<br />complete.
<br />
<br />Bid Item 18 - ELECTRICAL CONTROLS AND INSTRUMENTATION
<br />Measurement and Payment: Lump Sum (LS)
<br />The lump sum bid item for the ELECTRICAL - CONTROLS AND INSTRUMENTATION, LS
<br />shall be full compensation for all labor, material, incidentals, tools, and equipment necessary
<br />to satisfactorily complete the work as defined in the Standard Specifications, Standard
<br />Drawings, these specifications, and as shown on the Contract Plans.
<br />
<br />The work shall include, but is not limited to, the following: Pulsar Level Sensor (or approved
<br />equal), conduits, wiring, cabling, terminations, testing, supports, anchorage, switches,
<br />disconnects, grounding, overcurrent protection devices, metering, panelboards, and other
<br />miscellaneous and appurtenant work required to complete this item of work.
<br />
<br />Measurement and payment for electrical controls and instrumentation, PLC Control Cabinet
<br />Etc. will be on a lump sum basis, complete.
<br />