Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 8 <br /> <br />work as defined in the Standard Specifications, Standard Drawings, these Specifications, <br />and as shown on the Contract Plans <br /> <br />The installation of pump assemblies shall include, but is not limited to, the following: <br />fabrication, installation of two (2) new Flygt 3127N or approved equal submersible pump <br />assemblies, frames, discharge assembly, sensors, piping, piping transitions, controls, <br />conduits, wiring, terminations, controls testing, and other miscellaneous and appurtenant <br />work. <br /> <br />Measurement shall be per Each (EA) submersible pump installed as measured upon <br />completion. <br />Bid Item 17 - ELECTRICAL, VFD PANEL INSTALL <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid item for the electrical – Owner Furnished VFDs and Owner Furnished VFD <br />Panel shall be full compensation for all labor, material, incidentals, tools, and equipment <br />necessary to satisfactorily complete the work as defined in the Standard Specifications, <br />Standard Drawings, these specifications, and as shown on the Contract Plans. <br /> <br />The work shall include, but is not limited to, the following: Owner Furnished Variable <br />Frequency Drive (VFD) Panel and Owner Furnished VFDs. Conduits, wiring and cabling, <br />terminations, testing, supports, anchorage, switches, disconnects, grounding, overcurrent <br />protection devices, metering, panelboards, and other miscellaneous and appurtenant work <br />required to complete this item of work. <br /> <br />Measurement and payment for electrical VFDs, VFD panel will be on a lump sum basis, <br />complete. <br /> <br />Bid Item 18 - ELECTRICAL CONTROLS AND INSTRUMENTATION <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid item for the ELECTRICAL - CONTROLS AND INSTRUMENTATION, LS <br />shall be full compensation for all labor, material, incidentals, tools, and equipment necessary <br />to satisfactorily complete the work as defined in the Standard Specifications, Standard <br />Drawings, these specifications, and as shown on the Contract Plans. <br /> <br />The work shall include, but is not limited to, the following: Pulsar Level Sensor (or approved <br />equal), conduits, wiring, cabling, terminations, testing, supports, anchorage, switches, <br />disconnects, grounding, overcurrent protection devices, metering, panelboards, and other <br />miscellaneous and appurtenant work required to complete this item of work. <br /> <br />Measurement and payment for electrical controls and instrumentation, PLC Control Cabinet <br />Etc. will be on a lump sum basis, complete. <br /> <br />