Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />LS 47 – Beverly Lake Sewer ReplacementDivision B – BID DESCRIPTIONS January 30, 2025 <br />WO No. – UP3529 SP - 18 <br /> <br />Measurement and Payment: Unit Price per Lineal Foot (LF). <br />The unit contract price for UG POWER FROM LIFT STATION TO SNOPUD JCT BOX 2- <br />2” CONDUIT HDPE (Directionally Drilled) is per LF with conductors, shall constitute full <br />compensation for all labor, materials, tools and equipment necessary for shall be full compensation for all labor, material, incidentals, tools, and equipment necessary to satisfactorily complete the work as defined in the Standard Specifications, Standard Drawings, these specifications, and as shown on the Contract Plans. The work shall include, but is not limited to, conduits, wiring and cabling, testing, <br />supports, anchorage, switches, disconnects, grounding, overcurrent protection devices, <br />metering, panelboards, and other miscellaneous and appurtenant work required to <br />complete this item of work. See Appendix “F”. <br /> Measurement and payment for UG POWER FROM LS TO SNOPUD JCT BOX 2-2” <br />CONDUIT HDPE (HDD). will be on a LF basis, complete <br /> <br />Bid Item 35 - TOPSOIL FOR LANDSCAPE RESTORATION <br />Measurement and Payment: Unit Price per cubic-yard (CY). <br />The unit contract price for TOPSOIL FOR LANDSCAPE RESTORATION is CY and shall <br />constitute full compensation for all labor, materials, tools and equipment necessary for <br />installation of TOPSOIL for landscape and lawn restoration as directed by the Inspector and <br />as stipulated in paragraph 9-14.1. <br /> Measurement and payment for TOPSOIL FOR LANDSCAPE RESTORATION will be on a CY basis, complete. <br /> <br /> <br />Bid Item 36 - UG POWER FROM PUD POLE TO JCT BOX (2" CONDUIT IN TRENCH) <br />Measurement and Payment: Unit Price per Lineal Foot (LF). <br />The unit contract price for UG POWER FROM SnoPUD POLE TO JCT BOX (2" CONDUIT <br />IN TRENCH is per LF with conductors, shall constitute full compensation for all labor, <br />materials, tools and equipment necessary for shall be full compensation for all labor, <br />material, incidentals, tools, and equipment necessary to satisfactorily complete the work <br />as defined in the Standard Specifications, Standard Drawings, these specifications, and <br />as shown on the Contract Plans. <br /> <br />The work shall include, but is not limited to, conduits, , testing, supports, anchorage, <br />switches, disconnects, grounding, overcurrent protection devices, metering, panelboards, <br />and other miscellaneous and appurtenant work required to complete this item of work. <br /> <br />Measurement and payment for UG POWER FROM LS TO SnoPUD JCT BOX 2-2” <br />CONDUIT HDPE (HDD). will be on a LF basis, complete <br /> <br /> <br /> <br />