My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 39 <br />Working Drawings: Drawings, shop drawings, plans, diagrams, or calculations, <br />including a schedule of submittal dates for Working Drawings where specified, which the <br />Contractor must submit to the Engineer. (This definition replaces the definition in <br />WSDOT 1-01.3 for Working Drawings.) <br />Supplement Section 1-01.3 by adding the following: <br />All references in the Standard Specifications to the terms “State”, “Department of <br />Transportation”, “Washington State Transportation Commission”, “Commission”, <br />“Secretary of Transportation”, “Secretary”, “Headquarters”, and “State Treasurer” shall <br />be revised to read “City.” <br />All references to the terms “State” or “state” shall be revised to read “City” unless the <br />reference is to an administrative agency of the State of Washington, a State statute or <br />regulation, or the context reasonably indicates otherwise. <br />All references to “State Materials Laboratory” shall be revised to read “City designated <br />location.” <br />All references to “final contract voucher certification” shall be interpreted to mean the <br />City form(s) by which final payment is authorized, and final completion and acceptance <br />granted. <br /> <br />Additive: A supplemental unit of work or group of bid items, identified separately in the <br />Proposal, that may, at the discretion of the City, be awarded in addition to the base Bid. <br />Alternative or Alternate: One of two or more units of Work or groups of bid items, <br />identified separately in the Proposal, from which the City may make a choice between <br />different methods or material of construction for performing the same Work. <br />Award Date: The date of the formal action by the Everett City Council to accept the <br />lowest responsible and responsive Bidder for the Work. <br />Bid Opening Date: The date the Everett City Clerk publicly opens and reads the Bids. <br />Business Day: A business day is any day from Monday through Friday except holidays <br />as listed in 1-08.5. <br />Change Order: Reference to Change Order shall include all rights of the City and <br />Contractor under 1-04.4 CHANGES. Agreed Change Orders shall be in the form <br />attached as Appendix C. Unilateral Change Orders shall be in the form attached as <br />Appendix C. <br />City: The City of Everett, Washington. "City" and "Owner" and “Contracting Agency” <br />mean the same. <br />City's Representative: The person designated in writing by the City to act as its <br />representative at the construction site and to perform construction inspection service <br />and administrative functions relating to this Contract. The terms "Engineer", "Architect", <br />or “Owner’s Representative” shall be interchangeable with City's Representative. <br />Contract Claim: Any request by the Contractor for additional time or money resulting <br />in adjustment of Contract Sum or Contract Time irrespective of the cause or reason for <br />the request. Contract Claims include, but are not limited to, requests by the Contractor <br />for additional time or money due to Extra Work, inefficiencies, Delays, interferences, and <br />problems with the design. Contract Claim includes, but is not limited to, claims or <br />requests by Subcontractors for extensions of Contract Time, adjustment of Contract <br />Sum, additional compensation that the Contractor attempts to pass through or assert <br />against the City, or claims against the City arising out of a third party’s claim against the <br />Contractor. Certified Claim means the same as Contract Claim.
The URL can be used to link to this page
Your browser does not support the video tag.