My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/23/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Faber Construction Corporation 4/23/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 8:13:59 AM
Creation date
4/23/2025 8:00:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/23/2025
Council Approval Date
3/18/2020
End Date
4/30/2026
Department
Public Works
Department Project Manager
Dan Erinco
Subject / Project Title
Beverly Lake Sewer Replacement LS47 Project
Public Works WO Number
3529-21
Tracking Number
0004794
Total Compensation
$2,484,248.53
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />LS47-Beverly Lake Sewer Replacement Division 1 – GENERAL REQUIREMENTS January 30, 2025 <br />WO No – UP3529 SP – 70 <br /> <br />Supplement Section 1-05 by adding the following new subsections: <br />1-05.16 Water and Power <br />(******) <br />The Contractor shall make necessary arrangements and shall bear the costs for power and <br />water necessary for the performance of the Work, unless the Contract includes power and <br />water as a pay item. <br />Contractor shall pay all power and water costs until Substantial Completion, whether such <br />power or water is provided by temporary or permanent facilities. City shall not be liable for <br />any costs or Delays arising out of or caused by the availability or lack of availability of <br />permanent power or utilities. <br />1-05.17 Oral Agreements <br />(******) <br />No oral agreement, representation, or conversation with or by any officer, agent, or employee <br />of the City, either before or after execution of the Contract, shall affect or modify any of the <br />terms or obligations contained in any of the documents comprising the Contract. Such oral <br />agreement, representation or conversation shall be considered as unofficial information and <br />in no way binding upon the City, unless subsequently put in writing and signed by the City. <br />1-05.18 Contractor <br />(******) <br />1-05.18(1) Contractor's Representative <br />The Contractor shall notify the City in writing of the name of the person who will act as <br />the Contractor's representative, will have the authority to act in matter relating to this <br />Contract, and will be delegated with authority to act as the Contractor’s emergency <br />contact. This person shall have authority to carry out the provisions of the Contract and <br />to supply materials, Equipment, tools and labor without delay for the performance of the <br />Work. <br />Contractor shall employ and keep on site on a full time basis personnel experienced in <br />the management of construction of projects of this size and type. These shall include, <br />but not be limited to, a project manager and superintendent. Unless the City agrees <br />otherwise in writing, neither the Contractor’s project manager nor the superintendent <br />shall have supervisory responsibility for other projects for the Contractor while assigned <br />to this Project. Contractor shall employ and assign such additional, full time office, <br />support and engineering personnel to support the project manager and superintendent <br />and allow timely completion of the Project. The project manager and superintendent <br />shall be approved by the City, and such approval shall not be unreasonably withheld. <br />Contractor shall submit personnel qualifications within seven (7) days of Contractor’s <br />execution of the Contract. Basis for disapproval include, but are not limited to, lack of <br />sufficient experience managing the construction of similar type or size projects or <br />relationships on other projects unsatisfactory to the City or, if the Project is subject to <br />supplemental bidder responsibility criteria and such criteria contain personnel <br />qualifications, the personnel differ from those named by Bidder in its pre-Award <br />supplemental bidder responsibility criteria submittals. City may require removal and <br />replacement of Contractor’s supervisory staff who are disruptive or who appear to lack <br />sufficient competence to complete the Project successfully. <br />1-05.18(2) Construction Procedures <br />The Contractor shall supervise and direct the Work and determine the means, methods, <br />techniques, sequences and procedures of construction, except in those instances where
The URL can be used to link to this page
Your browser does not support the video tag.