My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6814 with exhibits
>
Resolutions
>
Resolution 6814 with exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:45:16 AM
Creation date
6/13/2016 11:43:42 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
Resolution 6814 with exhibits
Date
1/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 12, 3 of 10 <br /> Water Resources:Mitigation Measures Designed into the Proposal and Redevelopment of the site SEPA Checklist Port of Everett During any <br /> other Potential Mitigation Measures including site B.3.d. or responsible construction activity <br /> improvements, installation party doing the and during long- <br /> • Ecology Stormwater Permit and controls for sites greater than 5 acres of utilities and other work/project term operation of <br /> • Construction BMPs such as silt fencing,plastic covering for exposed construction activities and/or operating the proposal. <br /> ground,straw mulch,hydroseeding,sediment traps,rock lined the constructed Shoreline Permits, <br /> channels,check dams and temporary detention basins proposal Building Permits, <br /> • Cleaning construction equipment and vehicles before they leave the elements Public Works <br /> site. Permits,Federal and <br /> • Implementation of a City of Everett approved Temporary Erosion and Dept.of Ecology <br /> Control Plan Permits <br /> • Project operation runoff would be collected and treated for 100 percent <br /> of the site. A spill response program would be developed and <br /> implemented <br /> • A stormwater pollution prevention plan would be developed and <br /> implemented <br /> • Energy dissipating armoring around new and expanded stormwater <br /> outfalls would be provided <br /> • Obtain coverage under a Stormwater General Permit and use of <br /> operational BMPs to meet required water quality standards <br />
The URL can be used to link to this page
Your browser does not support the video tag.