Laserfiche WebLink
Exhibit 12, 4 of 10 <br /> Plants and Animals:Mitigation Measures Designed into the Proposal and Redevelopment of the site SEPA Checklist Port of Everett During any <br /> other Potential Mitigation Measures including site B.4.d and B.5.d. or responsible construction activity <br /> improvements, installation party doing the and during long- <br /> • Ecology Stormwater Permit and controls for sites greater than 5 acres of utilities and other work/project term operation of <br /> • Construction BMPs such as silt fencing,plastic covering for exposed construction activities and/or operating the proposal. <br /> ground,straw mulch,hydroseeding,sediment traps,rock-lined channels, the constructed Shoreline Permits, <br /> check dams and temporary detention basins. proposal Building Permits, <br /> • Cleaning construction equipment and vehicles before they leave the site. elements Public Works <br /> • Implementation of a City of Everett approved Temporary Erosion and Permits,Federal and <br /> Control Plan Dept.of Ecology <br /> • Project operation runoff would be collected and treated for 100 percent of Permits <br /> the site <br /> • A spill response program would be developed and implemented <br /> • A stormwater pollution prevention plan would be developed and <br /> implemented <br /> • Energy dissipating armoring around new and expanded stormwater outfalls <br /> would be provided <br /> • Add project landscaping to existing unvegetated shoreline edges of the site <br /> • Wherever feasible,remove all remaining creosote wood piling and <br /> bulkheads and replace with non-contaminating materials <br /> Energy and Natural Resources:Mitigation Measures Designed into the All site redevelopment SEPA Checklist Port of Everett During any <br /> Proposal and other Potential Mitigation Measures construction activities and B.6.c. or responsible construction activity <br /> long-term operations party doing the and during long- <br /> • City, State and Federal energy conservation guidelines related to the proposal work/project term operation of <br /> • City of Everett building code energy conservation measures and/or operating the proposal. <br /> • Port of Everett energy conservation BMPs the constructed Building permits. <br /> • Use of low-impact,sustainable design features in new buildings and site proposal <br /> improvements elements <br /> • Use of pedestrian and transit-oriented design in the project to reduce auto <br /> use <br />