Laserfiche WebLink
Exhibit 12, 5of10 <br /> Environmental Health and Noise:Mitigation Measures Designed into the All site redevelopment SEPA Checklist Port of Everett Prior to <br /> Proposal and other Potential Mitigation Measures construction activities and B.7.a.4)and or responsible development <br /> long-term operations B.7.b.3. party doing the permits. <br /> • Ecology approved cleanup plan under its Voluntary Cleanup Program related to the proposal work/project <br /> implementation for entire site and/or operating During any <br /> • Use of approved abatement plan for removal of hazardous materials from the constructed construction activity <br /> demolished buildingsproposal and during long- <br /> Health and safety procedures to protect workers'from exposed elements term operation of <br /> • contaminated soils during construction the proposal. <br /> • Use of appropriate contaminated soil management practices Building permits. <br /> • Deed restrictions on areas of the redeveloped site with permanently <br /> contained hazardous substances <br /> • Conduct groundwater compliance monitoring,as needed <br /> • Use properly sized/maintained mufflers <br /> • Use engine enclosures and intake silencers <br /> • Use standard construction site noise reduction techniques including use of <br /> electric or hydraulic impact tools <br /> • Use of alternatives to impact pile driving where feasible <br /> • Use of pile driving sound absorbing barriers and/or other sound reducing <br /> measures <br /> • Adhere to City noise ordinance hours and other applicable requirements <br /> • Incorporate special acoustical design features in all buildings located close <br /> to West Marine View Drive <br />