Laserfiche WebLink
Exhibit 12, 6 of 10 <br /> Land and Shoreline Use:Mitigation Measures Designed into the Proposal All site redevelopment SEPA Checklist Port of Everett PDO DA,Land <br /> and other Potential Mitigation Measures construction activities and B.g.l_ or responsible division, Shoreline <br /> long-term land and party doing the permits. <br /> • Incorporation of transit and pedestrian oriented design features shoreline use operations work/project <br /> • Inclusion of an integrated mix of land uses related to the proposal and/or operating <br /> During any <br /> • Enhanced on-site circulation for pedestrians and bicycles the constructed construction activity <br /> • Provision of new and enhanced pedestrian and transit linkages to proposal and during long- <br /> downtown Everett and surrounding areas elements term operation of <br /> • Inclusion of traffic-calming design features while enhancing vehicle the proposal. <br /> circulation Building permits. <br /> • Provision a variety of new public gathering places <br /> • Provision of public access to previously restricted shoreline areas on the <br /> site* <br /> • City of Everett Comprehensive plan,zoning and development regulations <br /> • City of Everett Shoreline Master Program <br /> • City of Everett/Port of Everett Planned Development Overlay(PDO) <br /> Development Agreement(DA)and Urban Design Guidelines <br /> • Port of Everett Project CC&Rs <br /> • Incorporation of feasible sustainable and low-impact development methods <br /> and techniques <br /> • Provision of orderly,multi-phase site redevelopment timetable <br />