My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6814 with exhibits
>
Resolutions
>
Resolution 6814 with exhibits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 11:45:16 AM
Creation date
6/13/2016 11:43:42 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
Resolution 6814 with exhibits
Date
1/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 12, 7 of 10 <br /> Aesthetics/Visual Quality:Mitigation Measures Designed into the Proposal All site redevelopment SEPA Checklist Port of Everett PDO DA,Land <br /> and other Potential Mitigation Measures construction activities and Section B.10.c. or responsible division, Shoreline <br /> long-term land and party doing the permits. <br /> • Removal or major renovation of remaining older buildings,and removal of shoreline use operations work/project <br /> remaining outdoor storage areas related to the proposal and/or operating <br /> • Removal of all overhead utilities Duringany <br /> the constructed construction activity <br /> • Removal of all potential taller view blocking trees proposal and during long- <br /> • Creation of permanent on-site view corridor elements term operation of <br /> • Construction of master designed urban activity center with:fully the proposal. <br /> landscaped streets and entryways;pedestrian orientation;network of open Building permits. <br /> spaces/plazas;unified landscaping,lighting and signage;architecturally <br /> thematic building designs for each district <br /> • Reduced large surface parking areas <br /> • Attractive rooftop design treatments <br /> • City of Everett/Port of Everett PDO DA and Urban Design Guidelines <br /> • Port of Everett Project CC&Rs <br /> Light, Glare and Shadows:Mitigation Measures Designed into the Proposal All site redevelopment SEPA Checklist Port of Everett PDO DA,Land <br /> and other Potential Mitigation Measures construction activities and Section B.11.d. or responsible division, Shoreline <br /> long-term land and party doing the permits. <br /> • Coordinated site lighting/shielding and landscaping plan to minimize on shoreline use operations work/project <br /> and off-site light and glare impacts related to the proposal and/or operating <br /> • Use of non-reflective roofing and façade materials on all buildings the constructed Duringany <br /> construction activity <br /> • Locate,design and orient all buildings to minimize light,glare and shadow proposal and during long- <br /> impacts on the most sensitive receiving areas including the site's shoreline elements term operation of <br /> walkways and public spaces <br /> the proposal. <br /> • City of Everett zoning code and Shoreline Master Program <br /> Building permits. <br /> • City of Everett/Port of Everett PDO DA and Urban Design Guidelines <br /> • Port of Everett Project CC&Rs <br />
The URL can be used to link to this page
Your browser does not support the video tag.