Laserfiche WebLink
Exhibit 12, 8 of 10 <br /> Parks and Recreation:Mitigation Measures Designed into the Proposal and All site redevelopment SEPA Checklist Port of Everett PDO DA, Land <br /> other Potential Mitigation Measures construction activities and Section B.12.c. or responsible division, Shoreline <br /> long-term land and party doing the permits. <br /> • New system of shoreline access areas,expanded public walkways,public shoreline use operations work/project <br /> spaces and recreational facilities(more than 21 new total acres) related to the proposal and/or operating <br /> During any New park,pathway and plaza improvements in early project phases the constructed construction <br /> activity <br /> • City of Everett zoning code and Shoreline Master Program proposal and during long- <br /> • City of Everett/Port of Everett PDO DA and Urban Design Guidelines elements term operation of <br /> • Port of Everett Project CC&Rs the proposal. <br /> Building permits. <br /> Historical and Cultural Resources:Mitigation Measures Designed into the All site redevelopment SEPA Checklist Port of Everett During any <br /> Proposal and other Potential Mitigation Measures construction activities Section B.13.d. or responsible construction activity <br /> party doing the and during long- <br /> • Archeologist review of geotechnical data and final design plans with any work/project term operation of <br /> appropriate follow-up actions <br /> the proposal. <br /> • Archeological monitoring during any major excavations with potential for Building permits. <br /> disturbance <br /> • Documentation of historical and cultural resources that cannot be retained <br /> • Consideration of on or off-site relocation of resources that otherwise would <br /> not be retained <br /> • Interpretive signage on use of site and lost resources <br /> • Inclusion of referential building to commemorate lost resources <br />