Laserfiche WebLink
Typical Wiring <br /> Single or cascaded booster NAC Circuit To next signaling <br /> g NAC Circuit device,booster,or <br /> anywhere on a notification appliance circuit EOL resistor <br /> ExistingNAC end-of-line resistors are not required to be 3 3 NAC output#1 <br /> q Fire Alarm U) N NAC output#2 <br /> installed at the booster's terminals.This allows multiple Control Panel N NAC output#3 <br /> boosters to be driven from a single NAC circuit without the ET NAC output#4 <br /> need for special configurations. <br /> Booster Power <br /> p] <br /> Supply <br /> Configuring the Booster for Multiple CC1(S) modules using the <br /> AC Power Fail delay operation* BPS'S sense inputs <br /> TB1 Notification appliance circuit(NAC) TB1 Notification appliance circuit(NAC) <br /> NAC1/+ UL listed NAC1/ + UL listed <br /> AUX1 - Y a a a EOL 15 kQ AUX1 - Y a a a EOL 15 KW <br /> NAC2/ + Notification appliance circuit(NAC) NAC2/ + Notification appliance circuit(NAC) <br /> AUX2 - AUX2 - <br /> NAC3/ + UL listed NAC3/ + UL listed <br /> AUX3 - Y a EOL 15 kO AUX3 - II Y EOL 15 KW <br /> NAC4/ + NAC4/ + <br /> AUX4 - AUX4 - <br /> 200 mAAUX 0 + 200 mAAUX,, <br /> Continuous m - Continuous m <br /> IN + IN ILE+ <br /> Sense 1 COM - Sense 1 COM EOL 47 K <br /> OUT - + OUT + <br /> IN 0 IN <br /> Sense 2 COM EOL 47 k4 109 Sense 2 COM I EOL 47 K <br /> OUT CC1(S)module[1][3] OUT 0 NO _ + - + <br /> Trouble COM 87 65 NO O 4 3 2 1 Trouble COM 0 110111121 <br /> NC NC 109 109 <br /> TB2 +- +-+- TB2 CC1(S)module CC1(S)module <br /> o • • • Data in from Data out t0 0 8765 ® 4321 8765 � 4321 <br /> module[4] previous device next device <br /> ® ® or Signature <br /> *The Booster supports AC Power fail delay <br /> of three hours via its trouble contact when <br /> dip switch SW2-6 is on.All other troubles <br /> are reported to supervising module or panel <br /> without delay via Sense inputs. <br /> Page 3 of 4 DATA SHEET E85005-0125 <br /> Not to be used for installation purposes. Issue 1.2 <br />