Laserfiche WebLink
b <br /> j n <br /> 5��. <br /> � <br /> SITE WORK <br /> 101 - TEMPORARY UTILITES <br /> Scope of Work <br /> • Owner to provide onsite bathroom facility for the duration of project <br /> • Owner to provide electrical power, water and heat source <br /> 105- DEMOLITION <br /> Scope of Work <br /> Remove the following items in the damaged areas. Refer to the attached Demolition Plan View sketch <br /> (dated 1/18/2018). All construction debris will be removed to proper disposal site unless otherwise noted. <br /> Interior Demolition at 3 interior office areas <br /> • Interior finish trims, floor base, as needed <br /> • Scrape popcorn texture off ceilings (undamaged drywall on ceiling to remain) <br /> • Remove drywall on walls <br /> • Windows treatment-blinds (Save for reinstallation) <br /> • Electrical wires/outlets on walls that are affected by the vehicle impact <br /> • Communication or cable wires or alarm system wires on walls that that are affected by the vehicle <br /> impact <br /> • Alarm system sensors (motion) (Save for reinstallation) <br /> • All insulation in East stud walls to be repaired <br /> • Remove, as needed, the stud walls/framing that are damaged <br /> • Insulation in attic as necessary to access framing and electrical wiring <br /> • Carpet to remain in place <br /> Exterior Demolition at East face <br /> • Windows frames and glass (total of 4 units)at East face, as shown on attached Demolition Plan View <br /> sketch <br /> • Siding and trim (approximately 25 feet) <br /> • Building paper and flashings <br /> • Plywood sheathing (approximately 25 feet) <br /> • Damaged tandscape debris <br /> • Temporary tarps and plywood <br /> • Damaged downspouts <br /> Not Included in Contract <br /> • Removing all interior items (i.e. personal items, proprietary equipment, desks, communications <br /> equipment/modems, storage items, etc.) in the rooms that are affected by the vehicle impact <br /> • Onsite and/or offsite storage costs <br /> • Exterior telephone equipmenbwiring repairs <br /> 106—LANDSCAPING <br /> Scope of Work <br /> Contractor to restore landscape to pre-damage condition, as much as practical. <br /> • Contractor to rebuild rockery along sidewalk <br /> • Contractor to replant shrubs (in 2 gallon pots), "similar species" to pre-damage condition <br /> ��a� ., � <br /> E � � �� <br /> , Owner's Initials �� <br />