Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-84 March 26, 2025 <br /> <br />Longitudinal location of stop lines ±1.0 feet (parallel to alignment) 1 <br />Transverse location of arrows and letters ±0.1 feet (normal to alignment) 2 <br />Longitudinal location of transitions and tapers ±1.0 feet (parallel to alignment) 3 <br />Pavement marking starts and stops ±1.0 feet (parallel to alignment) 4 <br /> 5 <br />The Contractor shall provide copies of any calculations, notes, and layout data 6 <br />to the Engineer, or their assigned representative, prior to grinding. The 7 <br />Contracting Agency will review the provided data, check the existing layout and 8 <br />provide revisions as necessary for establishment of lane widths, arrow and letter 9 <br />locations, tapers, transitions, other modifications, and pavement seams. The 10 <br />Contracting Agency will require up to seven calendar days from the date the 11 <br />data is received to conduct this review. No pavement grinding will be allowed 12 <br />before this review is complete. The Contractor will make adjustments to the curb 13 <br />marking and stakes to match the revisions prior to grinding. 14 <br /> 15 <br />Based on these records and/or the offset staking, the Contractor shall perform 16 <br />all field marking and preliminary spotting for all pavement marking and 17 <br />channelization following grinding operations, for temporary only. The 18 <br />Contracting Agency shall perform all field marking for permanent pavement 19 <br />marking and channelization. All calculations, surveying, and measuring required 20 <br />for setting and maintaining the necessary lines for the temporary pavement 21 <br />marking shall be the Contractor's responsibility. 22 <br /> 23 <br />Preliminary spotting shall be provided at a spacing of 40 foot maximum on 24 <br />tangents and 25 foot maximum on curves and tapers. All curves, tapers, stop 25 <br />lines, and crosswalks shall be laid out with a rope. Field layout for curves and 26 <br />tapers shall use an 800’ minimum length rope. The color of the material used 27 <br />for preliminary spotting shall be white. Longitudinal marking shall be parallel 28 <br />with the proposed line applied with a paint marker wand or other approved 29 <br />method, a minimum of 6 inches in length and wide enough so that a minimum 30 <br />of two marks can be clearly seen at night under ordinary headlight conditions. 31 <br />Refreshing of marks prior to striping shall be the responsibility of the Contractor. 32 <br /> 33 <br />Personnel performing the field layout and preliminary spotting shall be proficient 34 <br />in the practice of striping layout, including layout and preliminary spotting of 35 <br />curves and tapers using a rope and paint wand, proper annotation on the 36 <br />pavement of starts, stops, and changes in line type for pavement markings, and 37 <br />an understanding of WSDOT Standard Plans and City Standard Drawings for 38 <br />pavement markings. 39 <br /> 40 <br />Survey personnel performing the calculations, notes, and layout data shall be 41 <br />on site to answer questions regarding the layout notes as the roadway is being 42 <br />spotted or shall perform the work. In the event a revision is required by the 43 <br />Contracting Agency during field layout, either to correct errors in the notes or to 44 <br />make minor revision noted in the ordinary progress of the work, field layout shall 45 <br />be performed by the Contractor at the time. 46 <br /> 47 <br />All field layout and temporary pavement marking shall be completed during the 48 <br />same shift as the striping is obliterated by grinding or paving unless otherwise 49 <br />directed by the Engineer. 50