Laserfiche WebLink
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-31 March 26, 2025 <br /> <br />review no later than ***72 hours for day work and 30 days for night work*** prior to 1 <br />the day(s) the Contractor is requesting to change the hours. 2 <br /> 3 <br />***A Noise Variance, which shall be provided by the City, is required for Contract 4 <br />nighttime work and included as an appendix in these specifications. If the Contractor 5 <br />or the Engineer requests to do nighttime work that is not already established in the 6 <br />Contract, a 30-day notice is required. The Engineer will then review the request and 7 <br />apply for the Noise Variance; the City can deny the request at its sole discretion. 8 <br />Nighttime work is considered to be between 10 pm and 7 am unless otherwise stated. 9 <br />The following mitigation measures shall be in effect during a Noise Variance, though 10 <br />there may be additional project specific requirements: 11 <br />· Back-up alarms shall be directional broad band type alarms. 12 <br />· Trucks performing export haul shall have well maintained bed liners. 13 <br />· Tailgate slamming will be prohibited. 14 <br />· No construction work shall be allowed between 6 pm and 8 am on Saturdays, 15 <br />Sundays, or federally recognized holidays unless otherwise stated in the 16 <br />Noise Variance Permit.*** 17 <br /> 18 <br />If the Contracting Agency approves such a deviation, such approval may be subject 19 <br />to certain other conditions, which will be detailed in writing. For example: 20 <br /> 21 <br />1. On non-Federal aid projects, requiring the Contractor to reimburse the 22 <br />Contracting Agency for the costs in excess of straight-time costs for 23 <br />Contracting Agency representatives who worked during such times. (The 24 <br />Engineer may require designated representatives to be present during the 25 <br />work. Representatives who may be deemed necessary by the Engineer 26 <br />include but are not limited to: survey crews; personnel from the Contracting 27 <br />Agency’s material testing lab; inspectors; and other Contracting Agency 28 <br />employees or third party consultants when, in the opinion of the Engineer, 29 <br />such work necessitates their presence.) 30 <br />2. Considering the work performed on Saturdays, Sundays, and holidays as 31 <br />working days with regard to the contract time. 32 <br />3. Considering multiple work shifts as multiple working days with respect to 33 <br />contract time even though the multiple shifts occur in a single 24-hour period. 34 <br />4. If a 4-10 work schedule is requested and approved the non-working day for 35 <br />the week will be charged as a working day. 36 <br />5. If Davis Bacon wage rates apply to this Contract, all requirements must be 37 <br />met and recorded properly on certified payroll 38 <br /> 39 <br />1-08.1(7)A.RTF 40 <br />1-08.1(7)A Payment Reporting 41 <br />(November 25, 2024 APWA GSP 42 <br />Delete this section and replace it with the following: 43 <br /> 44 <br /> 1-08.1(7)A VACANT 45 <br /> 46 <br />1-08.1(8)B.RTF 47 <br />1-08.1(8)B Clauses Required in Subcontracts of All Tiers 48 <br />(November 25, 2024 APWA GSP) 49 <br />Delete item 8 of the second paragraph of Section 1-08.1(8)B. 50 <br /> 51