Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-33 March 26, 2025 <br /> <br />This project shall be physically completed within *** twenty-seven (27) working days. *** 1 <br /> 2 <br />1-08.5.OptionA.RTF 3 <br />1-08.5 Time for Completion 4 <br />(November 25, 2024 APWA GSP, Option A) 5 <br /> 6 <br />Revise the third and fourth paragraphs to read: 7 <br /> 8 <br />Contract time shall begin on the first working day following the Notice to Proceed Date. 9 <br /> 10 <br />Each working day shall be charged to the contract as it occurs, until the contract work is 11 <br />physically complete. If substantial completion has been granted and all the authorized 12 <br />working days have been used, charging of working days will cease. Each week the 13 <br />Engineer will provide the Contractor a statement that shows the number of working days: 14 <br />(1) charged to the contract the week before; (2) specified for the physical completion of 15 <br />the contract; and (3) remaining for the physical completion of the contract. The statement 16 <br />will also show the nonworking days and all partial or whole days the Engineer declares 17 <br />as unworkable The statement will be identified as a Written Determination by the 18 <br />Engineer. If the Contractor does not agree with the Written Determination of working 19 <br />days, the Contractor shall pursue the protest procedures in accordance with Section 1-20 <br />04.5. By failing to follow the procedures of Section 1-04.5, the Contractor shall be 21 <br />deemed as having accepted the statement as correct. If the Contractor is approved to 22 <br />work 10 hours a day and 4 days a week (a 4-10 schedule) and the fifth day of the week 23 <br />in which a 4-10 shift is worked would ordinarily be charged as a working day then the 24 <br />fifth day of that week will be charged as a working day whether or not the Contractor 25 <br />works on that day. 26 <br /> 27 <br />Revise the sixth paragraph to read: 28 <br /> 29 <br />The Engineer will give the Contractor written notice of the completion date of the contract 30 <br />after all the Contractor’s obligations under the contract have been performed by the 31 <br />Contractor. The following events must occur before the Completion Date can be 32 <br />established: 33 <br />1. The physical work on the project must be complete; and 34 <br />2. The Contractor must furnish all documentation required by the contract and required 35 <br />by law, to allow the Contracting Agency to process final acceptance of the contract. 36 <br />The following documents must be received by the Project Engineer prior to 37 <br />establishing a completion date: 38 <br /> a. Certified Payrolls (per Section 1-07.9(5)). 39 <br /> b. Material Acceptance Certification Documents 40 <br /> c. Monthly Reports in DMCS of the amounts paid including the final payment 41 <br />confirmation to all firms required by Section 1-08.1(7)A if applicable 42 <br /> d. Final Contract Voucher Certification 43 <br /> e. Copies of the approved “Affidavit of Prevailing Wages Paid” for the Contractor 44 <br />and all Subcontractors 45 <br />f. A copy of the Notice of Termination sent to the Washington State Department of 46 <br />Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the 47 <br />Notice of Termination by Ecology; and no rejection of the Notice of Termination 48 <br />by Ecology. This requirement will not apply if the Construction Stormwater 49