Laserfiche WebLink
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-70 March 26, 2025 <br /> <br />MTVs are distinguished, and how pavers and MTVs are cleaned so that one 1 <br />JMF does not adversely influence the other JMF. 2 <br /> 3 <br />d. Description of contingency plans for that day’s operations such as equipment 4 <br />breakdown, rain out, and supplier shutdown of operations. 5 <br /> 6 <br />e. Number of sublots to be placed, sequencing of density testing, and other 7 <br />sampling and testing. 8 <br /> 9 <br />5-04.3(15) Sealing Pavement Surfaces 10 <br />Apply a fog seal where shown in the plans. Construct the fog seal in accordance with 11 <br />Section 5-02.3. Unless otherwise approved by the Engineer, apply the fog seal prior to 12 <br />opening to traffic. 13 <br /> 14 <br />5-04.3(16) HMA Road Approaches 15 <br />Construct HMA approaches at the locations shown in the Plans or where staked by the 16 <br />Engineer, in accordance with Section 5-04. 17 <br /> 18 <br />5-04.4 Measurement 19 <br />HMA Cl. ___ PG ___, HMA for ___ Cl. ___ PG ___, and Commercial HMA will 20 <br />be measured by the ton in accordance with Section 1-09.2, with no deduction being 21 <br />made for the weight of asphalt binder, mineral filler, or any other component of the 22 <br />mixture. If the Contractor elects to remove and replace mix as allowed by Section 5-23 <br />04.3(11), the material removed will not be measured. 24 <br /> 25 <br />Roadway cores will be measured per each for the number of cores taken. 26 <br /> 27 <br />Pavement repair excavation will be measured by the square yard of surface marked prior 28 <br />to excavation. 29 <br /> 30 <br />Planing bituminous pavement will be measured by the square yard. 31 <br /> 32 <br />5-04.5 Payment 33 <br />Payment will be made for each of the following Bid items that are included in the 34 <br />Proposal: 35 <br /> 36 <br />“HMA Cl. ___ PG ___”, per ton. 37 <br /> 38 <br />“HMA for Approach Cl. ___ PG ___”, per ton. 39 <br /> 40 <br />“HMA for Preleveling Cl. ___ PG ___”, per ton. 41 <br /> 42 <br />“HMA for Pavement Repair Cl. ___ PG ___”, per ton. 43 <br /> 44 <br />“Commercial HMA”, per ton. 45