My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-74 March 26, 2025 <br /> <br /> 1 <br /> 2 <br />DIVISION7.GR7 3 <br />Division 7 4 <br />Drainage Structures, Storm Sewers, Sanitary 5 <br />Sewers, Water Mains, and Conduits 6 <br /> 7 <br />7-05.DOCX 8 <br />Manholes, Inlets, Catch Basins, and Drywells 9 <br /> 10 <br />7-05.3.DOCX 11 <br />Construction Requirements 12 <br /> 13 <br />GLF 7-05.3(1).DOCX 14 <br />Adjusting Manholes and Catch Basins to Grade 15 <br /> 16 <br />Section 7-05.3(1) of the standard specifications is deleted and replaced with the following: 17 <br /> 18 <br />(******) 19 <br />In most work locations, planing depth is equal to overlay depth. Therefore, significant 20 <br />iron adjustment is not anticipated, and adjustment of structures to grade shall occur 21 <br />only as needed and/or directed by the engineer. 22 <br /> 23 <br />Manholes, catch basins, and other structures shall not be adjusted to grade until the 24 <br />pavement is completed, at which time the center of each structure shall be carefully 25 <br />relocated from references previously established by the Contractor. The structure 26 <br />shall then be brought to proper grade as follows: 27 <br /> 28 <br />1. The existing cast iron ring and cover on manholes and existing cast iron frame 29 <br />and grates for catch basins and inlets shall be removed and thoroughly 30 <br />cleaned before reinstalling at the new elevation. 31 <br /> 32 <br />2. The asphalt concrete pavement shall be cut and removed to a new circle, the 33 <br />diameter of which shall be equal to the outside diameter of the cast iron frame 34 <br />plus 2’. 35 <br /> 36 <br />3. The roadway surface materials and crushed rocks shall be removed so the 37 <br />structure casting can be adjusted to the finished road grade elevation. 38 <br /> 39 <br />4. The cast iron frame shall be placed on concrete blocks and wedged up to the 40 <br />desired grade with plastic wedges. 41 <br /> 42 <br />5. The edges of the asphalt concrete pavement and the outer edge of the 43 <br />castings shall be painted with tack and HMA Class ½” PG 64-22 shall be 44 <br />placed and compacted in layers to a minimum of 91% of the maximum 45 <br />theoretical density of the HMA. 46 <br /> 47 <br />The completed patch shall match the existing paved surface for texture, density, and 48 <br />uniformity of grade. The joint between the patch and the existing pavement shall 49
The URL can be used to link to this page
Your browser does not support the video tag.