My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-76 March 26, 2025 <br /> <br /> 1 <br />GLF 7-05.5.DOCX 2 <br />7-05.5 Payment 3 <br /> 4 <br />Section 7-05.5 of the standard specifications is deleted and replaced with the following: 5 <br /> 6 <br />(******) 7 <br />Payment will be made for each of the following bid items that are included in the proposal: 8 <br /> 9 <br />“Adjust Manhole to Grade”, per each. 10 <br /> 11 <br />“Adjust Catch Basin/Inlet to Grade”, per each. 12 <br /> 13 <br />“Adjust Valve Box to Grade”, per each. 14 <br /> 15 <br />The payment for “Adjust Manhole to Grade”, “Adjust Catch Basin/Inlet to Grade”, shall be 16 <br />full compensation for all costs necessary to make the adjustment including temporary 17 <br />cover to adjust the existing structure to required elevation, construction of the asphalt 18 <br />transition around the structure, and restoration of the adjacent area. Adjustment of any 19 <br />structures twice will be paid as one adjustment. 20 <br /> 21 <br />END DIVISION7.RTF 22 <br /> 23 <br />END DIVISION 7 24 <br /> 25
The URL can be used to link to this page
Your browser does not support the video tag.