Laserfiche WebLink
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-76 March 26, 2025 <br /> <br /> 1 <br />GLF 7-05.5.DOCX 2 <br />7-05.5 Payment 3 <br /> 4 <br />Section 7-05.5 of the standard specifications is deleted and replaced with the following: 5 <br /> 6 <br />(******) 7 <br />Payment will be made for each of the following bid items that are included in the proposal: 8 <br /> 9 <br />“Adjust Manhole to Grade”, per each. 10 <br /> 11 <br />“Adjust Catch Basin/Inlet to Grade”, per each. 12 <br /> 13 <br />“Adjust Valve Box to Grade”, per each. 14 <br /> 15 <br />The payment for “Adjust Manhole to Grade”, “Adjust Catch Basin/Inlet to Grade”, shall be 16 <br />full compensation for all costs necessary to make the adjustment including temporary 17 <br />cover to adjust the existing structure to required elevation, construction of the asphalt 18 <br />transition around the structure, and restoration of the adjacent area. Adjustment of any 19 <br />structures twice will be paid as one adjustment. 20 <br /> 21 <br />END DIVISION7.RTF 22 <br /> 23 <br />END DIVISION 7 24 <br /> 25