My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-78 March 26, 2025 <br /> <br />8-09.4 Measurement 1 <br /> 2 <br />Section 8-09.4 is supplemented with the following: 3 <br /> 4 <br />Measurement of markers will be per hundred for markers furnished and in place. 5 <br /> 6 <br />8-09.5 Payment 7 <br /> 8 <br />Section 8-09.5 is supplemented with the following: 9 <br /> 10 <br />Payment will be made in accordance with section 1-04.1, for the following Bid item 11 <br />included in the Proposal: 12 <br /> 13 <br />“Raised Pavement Marker Type 2”, per hundred. 14 <br /> 15 <br /> 16 <br />GLF 8-13.DOCX 17 <br />8-13 MONUMENT CASES 18 <br /> 19 <br />Section 8-13 of the standard specifications is deleted and replaced by the following: 20 <br /> 21 <br />(******) 22 <br />8-13.1 Description 23 <br /> 24 <br />This work will consist of adjusting existing survey monument cases to grade in 25 <br />accordance with Standard Drawing No. 323 and these Special Provisions. 26 <br /> 27 <br />8-13.2 Vacant 28 <br /> 29 <br />8-13.3 Construction Requirements 30 <br /> 31 <br />Existing monument castings shall be adjusted to grade in the same manner as for 32 <br />manholes in Section 7-05.3(1) of these Special Provisions. 33 <br /> 34 <br />8-13.4 Measurement 35 <br /> 36 <br />Measurement of monument case and cover will be by the unit for each monument case 37 <br />and cover adjusted to grade. 38 <br /> 39 <br />8-13.5 Payment 40 <br /> 41 <br />Payment will be made for the following bid items when included in the proposal: 42 <br /> 43 <br />"Adjust Existing Monument Castings to Grade," per each; 44 <br /> 45 <br />The unit contract price for "Adjust Existing Monument Casing to Grade" shall include all 46 <br />costs to adjust the casting to finished grade. 47 <br /> 48 <br /> 49
The URL can be used to link to this page
Your browser does not support the video tag.