Laserfiche WebLink
e. The maximum amount of all reimbursement requests permitted to be submitted under this <br />Agreement, including the final reimbursement request, is limited to and shall not exceed <br />the total Grant Amount of this Agreement. <br />f. For travel costs, SUBRECIPIENT shall comply with 2 CFR 200.475 and should consult <br />their internal policies, state rates set pursuant to RCW 43.03.050 and RCW 43.03.060 as <br />now existing or amended, and federal maximum rates set forth at http://www.gsa gov, <br />and follow the most restrictive. If travel costs exceed set state or federal limits, travel costs <br />shall not be reimbursed without written approval by DEPARTMENT's Key Personnel. <br />g. Receipts and/or backup documentation for any approved items that are authorized under <br />this Agreement must be maintained by the SUBRECIPIENT consistent with record <br />retention requirements of this Agreement, and be made available upon request by the <br />DEPARTMENT, and local, state, or federal auditors. <br />h. The SUBRECIPIENT will submit reimbursement requests to the DEPARTMENT by <br />submitting a properly completed State A-19 Invoice Form, Interagency Electronic Funds <br />Transfer or Agency/Business invoice with support documentation detailing the <br />expenditures for which reimbursement is sought. Reimbursement requests must be <br />submitted by email to both the DEPARTMENT's Hazard Mitigation Program Coordinator <br />and the Program Manager no later than the due dates listed within the Grant Timeline <br />(Attachment 4), but not more frequently than monthly. <br />All work under this Agreement must end on or before the Grant Agreement End Date, and <br />the final reimbursement request must be submitted to the DEPARTMENT within 45 days <br />after the Grant Agreement End Date, except as otherwise authorized by written <br />amendment of this Agreement and issued by the DEPARTMENT. <br />If applicable, no costs for purchases of equipment/supplies will be reimbursed until the <br />related equipment/supplies have been received by the SUBRECIPIENT, its contractor, or <br />any non-federal entity to which the SUBRECIPIENT makes a subaward, and is invoiced <br />by the vendor. <br />Failure to timely submit complete reports and reimbursement requests as required by this <br />Agreement (including but not limited to those reports in the Project Development Schedule <br />Attachment 4) will prohibit the SUBRECIPIENT from being reimbursed until such complete <br />reports and reimbursement requests are submitted and the DEPARTMENT has had <br />reasonable time to conduct its review. Final reimbursement requests will not be approved <br />for payment until the SUBRECIPIENT is current with all reporting requirements contained <br />in this Agreement. <br />SUBRECIPIENTs shall only use federal award funds under this Agreement to supplement <br />existing funds, and will not use them to replace (supplant) non-federal funds that have <br />been budgeted for the same purpose. <br />The SUBRECIPIENT may be required to demonstrate and document that the reduction in <br />non-federal resources occurred for reasons other than the receipt or expected receipt of <br />federal funds. <br />j• <br />5. REPORTING REQUIREMENTS <br />In addition to the reports as may be required elsewhere in this Agreement the SUBRECIPIENT <br />shall promptly prepare and submit the following reports to the DEPARTMENT's Key Personnel <br />a. Quarterly progress reports, no later than the 15th day following the end of the fiscal quarter, <br />indicating the status of the project, to include a brief narrative on progress during the <br />quarter. The report shall identify the costs incurred to date, the percentage of work <br />completed, the anticipated completion date of the project, and whether cost under runs or <br />over runs are expected. In addition, the SUBRECIPIENT should note any challenges or <br />issues associated with the project. Failure to submit a complete quarterly report within 15 <br />days following the end of the quarter will result in suspension of all payments to the <br />SUBRECIPIENT until a complete quarterly report is received by the DEPARTMENT. <br />Mitigation Project Grant Agreement — REV 8/8/23 Page 5 of 30 City of Everett, D25-042-Revised <br />