My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 4/7/2025 Amendment 1
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
WA ST Military Dept 4/7/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 10:22:35 AM
Creation date
5/16/2025 10:05:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
4/7/2025
Council Approval Date
4/16/2025
End Date
4/30/2026
Department
Public Works
Department Project Manager
Shaun Bridge
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003456
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
thereafter until the Agreement is closed. The form is incorporated by reference herein and <br />made a part of this Agreement. <br />c. Monitoring activities may include, but are not limited to: <br />i. Review of financial and performance reports; <br />ii. Monitoring and documenting the completion of Agreement deliverables; <br />Documentation of phone calls, meetings, e-mails, and correspondence; <br />iv. Review of reimbursement requests and supporting documentation to ensure <br />allowability and consistency with Agreement work plan, budget, and federal <br />requirements; <br />v. Observation and documentation of Agreement related activities, such as <br />exercises, training, funded events, and equipment demonstrations; and <br />vi. On -site visits to review equipment records and inventories, to verify source <br />documentation for reimbursement requests and performance reports, and to verify <br />completion of deliverables. <br />d. The SUBRECIPIENT is required to meet or exceed the monitoring activities, as outlined <br />above and in 2 CFR Part 200, for any non-federal entity to which the SUBRECIPIENT <br />makes a subaward as a pass -through entity under this Agreement. <br />e. Compliance will be monitored throughout the performance period to assess risk Concerns <br />will be addressed through a Corrective Action Plan. <br />9. CLOSE-OUT <br />To initiate close-out the SUBRECIPIENT is required to certify in writing the date completed and <br />total amount expended on the project on FINAL PROJECT REPORT form to the DEPARTMENT. <br />After receipt of the FINAL PROJECT REPORT form, the DEPARTMENT will conduct a site <br />inspection and review supporting documentation for compliance with the requirements of the <br />Agreement. <br />Prior to project close-out, the SUBRECIPIENT shall provide the DEPARTMENT with acceptable <br />documentation supporting compliance with the Agreement General documentation supporting <br />compliance with the Agreement typically includes, but is not limited to, the following: <br />a. Photographs of the structures or properties involved in the project prior to project <br />implementation and after project implementation <br />b. Digital geospatial coordinates (latitude and longitude) for each structure with an accuracy of <br />± 20 meters (64) feet. <br />c. Certificate of occupancy or equivalent documentation from the appropriate regulatory <br />authority for each structure to certify it is code -compliant. <br />d. Certification that the SUBRECIPIENT has met the environmental and historic preservation <br />conditions of the grant award as described in this Agreement. <br />e. Copies of all compliance and consultation documentation required by the grant award as <br />described in the Agreement (e.g., coastal zone management consistency determination from <br />Department of Ecology). <br />f. Copies of all documentation related to inspection for and removal and disposal of asbestos <br />and other hazardous materials from each property. <br />Specific additional documentation requirements for projects to acquire properties for open space <br />include, but are not limited to, the followings <br />a Signed Statement of Voluntary Participation from the owner of each acquired property. <br />b. Documentation of dates of acquisition and structure demolition or removal from property for <br />each property. <br />c. Copy of recorded open space deed restrictions for each acquired property. <br />d. Copy of the AW-501 form filed with the NFIP for each acquired repetitive loss property. <br />e. Documentation of consultation with the Army Corps of Engineers and Washington State <br />Department of Transportation regarding future use of each property. <br />Specific additional documentation requirements for projects to elevate structures above the base <br />flood elevation include, but are not limited to, the following: <br />Mitigation Project Grant Agreement— REV 8/8/23 Page 7 of 30 City of Everett, D25-042-Revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.