Laserfiche WebLink
TRICO Companies, LLC <br /> PO Box 409 TRICO <br /> 15066 Josh Wilson Rd <br /> Burlington, WA 98233 <br /> Phone: (360) 757-2373 <br /> Fax: (360) 757-3963 <br /> REQUEST FOR INFORMATION - 02 <br /> Project: ZAP Energy Bank A Shielding <br /> 6/S-310 Hold Down Detail <br /> To: Rodrigo Carreno,Quoc Le Subject: Confirmation <br /> From: Connor Spahman Date: 11/19/2024 <br /> CC: Jordan Meehan,Jason Solie Return By: 11/26/2024 <br /> Cost Impact: TBD Schedule Impact: TBD <br /> Drawing#: 6 S-310 Detail: <br /> Question: <br /> Please reference the attached detail 6/5-310 framing detail. Please confirm if the hold down detail <br /> shown on 6/5-310 is only required at back to back studs as flagged. <br /> Response: <br /> Confirmed, the hold-down attachment shown on detail 6/S-310 only applies to back-to-back <br /> joist along gridline J on ceiling framing plan (S-101) <br /> Response by: Rodrigo Carreno, Walter P. Moore Date: 11/20/2024 <br /> PAWS Wildlife Building <br />