Laserfiche WebLink
Finding:The subject property is located in Zone "X" as shown by the National Flood Insurance Program <br /> Map for the City of Everett.Zone X refers to those properties outside the 500-year flood area,thus EMC <br /> 19.30 does not apply. <br /> 11. Landscaping Standards-The proposed project and design shall meet the landscaping standards as <br /> established in EMC19.35. <br /> Finding: EMC Title 19.35 requires one street tree with a minimum caliper of two inches for every 30 feet <br /> of street frontage along the street.A minimum of two street trees will be required to be planted prior to <br /> final approval. <br /> II. DECISION: NOW,THEREFORE,the City of Everett hereby GRANTS PRELIMINARY APPROVAL with <br /> conditions listed below. Final approval of this short subdivision shall be granted subject to the <br /> satisfactory completion of the specified requirements and improvements in the Everett Municipal Code <br /> as specified in Sections IV and V listed below within five years from the date of this approval. Preliminary <br /> Approval will lapse if all the specified requirements and improvements have not been completed to the <br /> satisfaction of the City prior to expiration date. <br /> PRELIMINARY APPROVAL DATE:July 17, 2021 <br /> EXPIRATION OF PRELIMINARY APPROVAL:July 17, 2026 <br /> Yorik Stevens-Wadja, Planning Director <br /> III. APPEALS TO HEARING EXAMINER FOR SHORT SUBDIVISION:This administrative decision may be <br /> appealed to the Hearing Examiner no later than 14 days from the day after the date of mailing of the <br /> decision. For information regarding appeals please refer to Everett Municipal Code Title 15 or contact <br /> Dennis Osborn at 425.257.8731 or dosborn@everettwa.gov with any questions. <br /> IV. CONDITIONS OF APPROVAL&FINAL APPROVAL OF THIS SHORT SUBDIVISION:All requirements, <br /> permits, and improvements listed below are required to be completed prior to submitting the final plat <br /> map. <br /> 1. A Public Works Permit is required for this project. Detailed drawings in accordance with the current <br /> City of Everett Design and Construction Standards and Specifications for Development shall be <br /> submitted to the Permit Counter,showing site grading, paving, landscaping, utilities,storm drainage, <br /> temporary construction erosion and sedimentation control (TESC),and all required improvements in <br /> the public right-of-way. Public Works Department approval of these drawings is required prior to any <br /> permits being issued. All improvements shall be completed,approved,and warranted before the <br /> Occupancy Permit is issued/final approval is granted. <br /> 2. Short Plat requirements will include stubbing utilities to each lot,creating a paved access drive, <br /> providing all required drainage mitigation elements including amended soils, installing all required <br /> landscaping,and the required frontage improvements per Title 19 of the EMC. <br /> Page 5 of 8 <br />