My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Attachment A <br /> <br />May 7, 2025 Everett Transit College Plug-In Bus Charger Page | 3 <br /> <br />Org Chart <br /> <br />Exclusions and Assumptions <br />The following identifies exclusions and assumptions to which DEA has relied in determining <br />DEA’s effort, fee, scope, and schedule for the Project. If an assumption proves invalid, Client <br />and DEA agree to renegotiate DEA’s level of effort (number of hours), fee, scope and/or <br />schedule. <br />1. This proposal is valid for 90 days. <br />2. A Time and Materials contract for services will be negotiated and signed and Notice to <br />Proceed (NTP) issued before work begins. <br />3. Work will be under the direction of Everett Transit personnel. <br />4. KPFF Consulting Engineers will provide support with Civil design. <br />5. All electrical design work will be completed in accordance with a mutually upon agreed <br />schedule as shown in the scope of work above. <br />6. Any required electronic background drawings will be provided by Everett Transit in <br />AutoCAD 2024 format. <br />7. Drawings will be completed using AutoCAD 2024 format. <br />8. Rough Order of Magnitude (ROM) of electrical costs will be prepared using 2025 RS <br />Mean’s Electrical Cost Data and quotes from electrical equipment manufacturers or <br />distributors. Everett Transit will include contingency for the recent bidding climate and <br />long lead times of electrical equipment. <br />9. All deliverables listed above will be provided electronically in PDF format. <br />10. Any changes to the scope of work or fee proposal for this agreement shall be <br />documented in writing (email will suffice) before additional work is performed. <br />Project Manager <br />Dimitri Siaterlis, PE <br />Senior Electrical <br />Designer <br />Curtis Smith <br />Quality Manager <br />Deal Ralphs, PE <br />Project <br />Coordinator <br />Shay Witten
The URL can be used to link to this page
Your browser does not support the video tag.