My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP84 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />equipment shall be compacted by other mechanical means. Any HMA that becomes 1 <br />loose, broken, contaminated, shows an excess or deficiency of asphalt, or is in any way 2 <br />defective, shall be removed and replaced with new hot mix that shall be immediately 3 <br />compacted to conform to the surrounding area. 4 <br /> 5 <br />The type of rollers to be used and their relative position in the compaction sequence 6 <br />shall generally be the Contractor’s option, provided the specified densities are attained. 7 <br />Unless the Engineer has approved otherwise, rollers shall only be operated in the static 8 <br />mode when the internal temperature of the mix is less than 175°F. Regardless of mix 9 <br />temperature, a roller shall not be operated in a mode that results in checking or cracking 10 <br />of the mat. Rollers shall only be operated in static mode on bridge decks. 11 <br /> 12 <br />5-04.3(10)B HMA Compaction - Cyclic Density 13 <br />Low cyclic density areas are defined as spots or streaks in the pavement that are less 14 <br />than 90 percent of the theoretical maximum density. At the Engineer’s discretion, the 15 <br />Engineer may evaluate the HMA pavement for low cyclic density, and when doing so will 16 <br />follow WSDOT SOP 733. A $500 Cyclic Density Price Adjustment will be assessed for 17 <br />any 500-foot section with two or more density readings below 90 percent of the 18 <br />theoretical maximum density. 19 <br /> 20 <br />5-04.3(10)C Vacant 21 <br /> 22 <br />5-04.3(10)D HMA Nonstatistical Compaction 23 <br /> 24 <br />5-04.3(10)D1 HMA Nonstatistical Compaction - Lots and Sublots 25 <br />HMA compaction which is accepted by nonstatistical evaluation will be based on 26 <br />acceptance testing performed by the Contracting Agency dividing the project into 27 <br />compaction lots. 28 <br /> 29 <br />A lot is represented by randomly selected samples of the same mix design that will be 30 <br />tested for acceptance. A lot is defined as the total quantity of material or work produced 31 <br />for each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be 32 <br />equal to one day’s production or 400 tons, whichever is less except that the final sublot 33 <br />will be a minimum of 200 tons and may be increased to 800 tons. Testing for compaction 34 <br />will be at the rate of 5 tests per sublot per WSDOT T 738. 35 <br /> 36 <br />The sublot locations within each density lot will be determined by the Engineer. For a lot 37 <br />in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request 38 <br />after the Engineer is satisfied that material conforming to the Specifications can be 39 <br />produced. 40 <br /> 41 <br />HMA mixture accepted by commercial evaluation and HMA constructed under conditions 42 <br />other than those listed above shall be compacted on the basis of a test point evaluation 43 <br />of the compaction train. The test point evaluation shall be performed in accordance with 44 <br />instructions from the Engineer. The number of passes with an approved compaction 45 <br />train, required to attain the maximum test point density, shall be used on all subsequent 46 <br />paving. 47 <br /> 48
The URL can be used to link to this page
Your browser does not support the video tag.