Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP118 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />CNH 8-22.DOCX 1 <br />8-22 PAVEMENT MARKING 2 <br /> 3 <br />(******) 4 <br /> 5 <br />Section 8-22 of the Standard Specification is supplemented by the following: 6 <br /> 7 <br />8-22.2 Materials 8 <br /> 9 <br />All plastic marking, except bicycle pavement markings and symbols, shall be Type D. 10 <br /> 11 <br />8-22.3 Construction Requirements 12 <br /> 13 <br />Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard 14 <br />Specifications with the following modifications: 15 <br /> 16 <br />1. All Stop Line shall be 24” wide Type D extruded plastic flat line. Spray Type D is 17 <br />not allowed. 18 <br />2. All Crosswalk Line shall be solid white lines, 24” wide, installed in accordance with 19 <br />City of Everett Standard Drawing No. 721 and shall be Type D extruded plastic 20 <br />flat line. Spray Type D is not allowed. 21 <br />3. All two-way left turn yellow lines and lane lines dividing two opposing directions of 22 <br />travel shall be Type D plastic flat line. 23 <br />4. Profiled plastic Type D material, where called for in the Appendices to the Special 24 <br />Provisions, shall be used for lane line dividing traffic in the same direction of travel 25 <br />including plastic skip white lane line, and solid white edge line, or other lines 26 <br />staked by the Engineer. 27 <br />5. All white parking lines shall be shall be Type D plastic flat line. 28 <br />6. All wide line and dotted extension line shall be Type D plastic flat line. 29 <br />7. Access parking space symbols, arrows, letters, bicycle symbols, and speed hump 30 <br />symbols shall be Type D extruded plastic flat line. Spray Type D is not allowed. 31 <br /> 32 <br />8-22.3(1) Preliminary Spotting 33 <br /> 34 <br />Section 8-22.3(1) is supplemented with the following: 35 <br /> 36 <br />(******) 37 <br />Contractor Surveying – Roadway Striping and Channelization 38 <br /> 39 <br />No survey control data or layout will be furnished by the Contracting Agency. 40 <br />The Contractor shall be solely responsible for detailed documentation (records) 41 <br />of all existing pavement markings and channelization in the field prior to grinding 42 <br />operations. This work includes but is not limited to: field notes, sketches, offset 43 <br />markings on curbs or staking if no curb exists. 44