Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP34 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />Joint Checking 2 <br />A joint check is a check between a subcontractor and the Contractor to the supplier 3 <br />of materials/supplies. The check is issued by the Contractor as payer to the 4 <br />subcontractor and the material supplier jointly for items to be incorporated into the 5 <br />project. The DBE must release the check to the supplier, while the Contractor acts 6 <br />solely as the guarantor. 7 <br /> 8 <br />A joint check agreement must be approved by the Engineer and requested by the 9 <br />DBE involved using the DBE Joint Check Request Form (WSDOT Form 272-053) 10 <br />prior to its use. The form must accompany the DBE Joint Check Agreement between 11 <br />the parties involved, including the conditions of the arrangement and expected use 12 <br />of the joint checks. 13 <br /> 14 <br />The approval to use joint checks and the use will be closely monitored by the 15 <br />Engineer. To receive DBE credit for performing a CUF with respect to obtaining 16 <br />materials and supplies, a DBE must “be responsible for negotiating price, 17 <br />determining quality and quantity, ordering the material, installing and paying for the 18 <br />material itself.” The Contractor shall submit DBE Joint Check Request Form to the 19 <br />Engineer and be in receipt of written approval prior to using a joint check. 20 <br /> 21 <br />Material costs paid by the Contractor directly to the material supplier are not allowed. 22 <br />If proper procedures are not followed or the Engineer determines that the 23 <br />arrangement results in lack of independence for the DBE involved, no DBE credit will 24 <br />be given for the DBE’s participation as it relates to the material cost. 25 <br /> 26 <br />Prompt Payment 27 <br />Prompt payment to all subcontractors shall be in accordance with Section 1-08.1. 28 <br />Prompt payment requirements apply to progress payments as well as return of 29 <br />retainage. 30 <br /> 31 <br />Reporting 32 <br />The Contractor and all subcontractors of any tier, suppliers, service providers, and 33 <br />professional services that utilize DBEs to perform work on the project, shall maintain 34 <br />appropriate records that will enable the Engineer to verify DBE participation 35 <br />throughout the life of the project. 36 <br /> 37 <br />Refer to Section 1-08.1 for additional reporting requirements associated with this 38 <br />Contract. 39 <br /> 40 <br />Crediting DBE Participation 41 <br />General 42 <br />Subcontractors proposed as COA must be certified prior to the due date for bids on 43 <br />the Contract. All non-COA DBE subcontractors shall be certified before the 44 <br />subcontract on which they are participating is executed. 45 <br /> 46 <br />DBE participation is only credited upon payment to the DBE. 47 <br /> 48 <br />DBE Prime Contractor and Subcontractor Participation 49 <br />Only take credit for the Work that the DBE contractor performs with its own forces 50 <br />and is certified to perform. 51 <br /> 52