2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP52 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />property. Copies of the easement agreements may be included in the Contract 1 <br />Provisions or made available to the Contractor as soon as practical after they have been 2 <br />obtained by the Engineer. 3 <br /> 4 <br />Whenever easements or rights of entry have not been acquired prior to advertising, 5 <br />these areas are so noted in the Plans. The Contractor shall not proceed with any portion 6 <br />of the work in areas where right of way, easements or rights of entry have not been 7 <br />acquired until the Engineer certifies to the Contractor that the right of way or easement is 8 <br />available or that the right of entry has been received. If the Contractor is delayed due to 9 <br />acts of omission on the part of the Contracting Agency in obtaining easements, rights of 10 <br />entry or right of way, the Contractor will be entitled to an extension of time. The 11 <br />Contractor agrees that such delay shall not be a breach of contract. 12 <br /> 13 <br />Each property owner shall be given 48 hours notice prior to entry by the Contractor. This 14 <br />includes entry onto easements and private property where private improvements must 15 <br />be adjusted. 16 <br /> 17 <br />The Contractor shall be responsible for providing, without expense or liability to the 18 <br />Contracting Agency, any additional land and access thereto that the Contractor may 19 <br />desire for temporary construction facilities, storage of materials, or other Contractor 20 <br />needs. However, before using any private property, whether adjoining the work or not, 21 <br />the Contractor shall file with the Engineer a written permission of the private property 22 <br />owner, and, upon vacating the premises, a written release from the property owner of 23 <br />each property disturbed or otherwise interfered with by reasons of construction pursued 24 <br />under this contract. The statement shall be signed by the private property owner, or 25 <br />proper authority acting for the owner of the private property affected, stating that 26 <br />permission has been granted to use the property and all necessary permits have been 27 <br />obtained or, in the case of a release, that the restoration of the property has been 28 <br />satisfactorily accomplished. The statement shall include the parcel number, address, 29 <br />and date of signature. Written releases must be filed with the Engineer before the 30 <br />Completion Date will be established. 31 <br /> 32 <br />1-08.GR1 33 <br />Prosecution and Progress 34 <br /> 35 <br />1-08.0.RTF 36 <br />1-08 PROSECUTION AND PROGRESS 37 <br /> 38 <br />Add the following new section: 39 <br /> 40 <br />1-08.0 Preliminary Matters 41 <br />(May 25, 2006 APWA GSP) 42 <br /> 43 <br />1-08.0(1).RTF 44 <br />Add the following new section: 45 <br /> 46 <br />1-08.0(1) Preconstruction Conference 47 <br />(July 8, 2024APWA GSP) 48 <br /> 49