My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP69 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />The Contractor may use up to 20 percent RAP by total weight of HMA with no additional 1 <br />sampling or testing of the RAP. 2 <br /> 3 <br />If the Contractor wishes to utilize High RAP/Any RAS, the design must be listed on the 4 <br />WSDOT Qualified Products List (QPL). 5 <br /> 6 <br />The grade of asphalt binder shall be as required by the Contract. Blending of asphalt 7 <br />binder from different sources is not permitted. 8 <br /> 9 <br />The Contractor may only use warm mix asphalt (WMA) processes in the production of 10 <br />HMA with 20 percent or less RAP by total weight of HMA. The Contractor shall submit to 11 <br />the Engineer for approval the process that is proposed and how it will be used in the 12 <br />manufacture of HMA. 13 <br /> 14 <br />Production of aggregates shall comply with the requirements of Section 3-01. 15 <br />Preparation of stockpile site, the stockpiling of aggregates, and the removal of 16 <br />aggregates from stockpiles shall comply with the requirements of Section 3-02. 17 <br /> 18 <br />5-04.2(1) How to Get an HMA Mix Design on the QPL 19 <br />If the Contractor wishes to submit a mix design for inclusion in the Qualified Products List 20 <br />(QPL), please follow the WSDOT process outlined in Standard Specification 5-04.2(1). 21 <br /> 22 <br />5-04.2(1)A Vacant 23 <br /> 24 <br />5-04.2(2) Mix Design - Obtaining Project Approval 25 <br />No paving shall begin prior to the approval of the mix design by the Engineer. 26 <br /> 27 <br />Nonstatistical evaluation will be used for all HMA not designated as Commercial HMA 28 <br />in the Contract documents. 29 <br /> 30 <br />Commercial evaluation will be used for Commercial HMA and for other classes of HMA 31 <br />in the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, 32 <br />gores, prelevel, temporary pavement, and pavement repair. Other nonstructural 33 <br />applications of HMA accepted by commercial evaluation shall be as approved by the 34 <br />Project Engineer. Sampling and testing of HMA accepted by commercial evaluation will 35 <br />be at the option of the Project Engineer. The Proposal quantity of HMA that is accepted 36 <br />by commercial evaluation will be excluded from the quantities used in the determination 37 <br />of nonstatistical evaluation. 38 <br /> 39 <br />Nonstatistical Mix Design. Fifteen days prior to the first day of paving the Contractor 40 <br />shall provide one of the following mix design verification certifications for Contracting 41 <br />Agency review; 42 <br /> 43 <br />· The WSDOT Mix Design Evaluation Report from the current WSDOT QPL, or 44 <br />one of the mix design verification certifications listed below. 45 <br />· The proposed HMA mix design on WSDOT Form 350-042 with the seal and 46 <br />certification (stamp & signature) of a valid licensed Washington State 47 <br />Professional Engineer. 48
The URL can be used to link to this page
Your browser does not support the video tag.