My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP70 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />· The Mix Design Report for the proposed HMA mix design developed by a 1 <br />qualified City or County laboratory that is within one year of the approval date. 2 <br /> 3 <br />The mix design shall be performed by a lab accredited by a national authority such as 4 <br />Laboratory Accreditation Bureau, L-A-B for Construction Materials Testing, The 5 <br />Construction Materials Engineering Council (CMEC’s) ISO 17025 or AASHTO 6 <br />Accreditation Program (AAP) and shall supply evidence of participation in the AASHTO: 7 <br />resource proficiency sample program. 8 <br /> 9 <br />Mix designs for HMA accepted by Nonstatistical evaluation shall: 10 <br /> 11 <br />· Be designed for 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br />*** 17 <br />o W Mukilteo Blvd – 6.0 18 <br />*** 19 <br />million equivalent single axle loads (ESALs). 20 <br />· Have the aggregate structure and asphalt binder content determined in 21 <br />accordance with WSDOT Standard Operating Procedure 732 and meet the 22 <br />requirements of Sections 9-03.8(2), except that Hamburg testing for ruts and 23 <br />stripping are at the discretion of the Engineer, and 9-03.8(6). 24 <br />· Have anti-strip requirements, if any, for the proposed mix design determined in 25 <br />accordance with AASHTO T 283 or T 324 or based on historic anti-strip and 26 <br />aggregate source compatibility from previous WSDOT lab testing. 27 <br /> 28 <br />At the discretion of the Engineer, agencies may accept verified mix designs older than 12 29 <br />months from the original verification date with a certification from the Contractor that the 30 <br />materials and sources are the same as those shown on the original mix design. 31 <br /> 32 <br />Commercial Evaluation Mix Design. Approval of a mix design for “Commercial 33 <br />Evaluation” will be based on a review of the Contractor’s submittal of WSDOT Form 350-34 <br />042 (for commercial mixes, AASHTO T 324 evaluation is not required) or a Mix Design 35 <br />from the current WSDOT QPL or from one of the processes allowed by this section. 36 <br />Testing of the HMA by the Contracting Agency for mix design approval is not required. 37 <br /> 38 <br />For the Bid Item Commercial HMA, the Contractor shall select a class of HMA and 39 <br />design level of ESALs appropriate for the required use. 40 <br /> 41 <br />5-04.2(2)B Using Warm Mix Asphalt Processes 42 <br />The Contractor may elect to use additives that reduce the optimum mixing temperature 43 <br />or serve as a compaction aid for producing HMA. Additives include organic additives, 44
The URL can be used to link to this page
Your browser does not support the video tag.