My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHINGTON <br />CITY OF EVERETT <br />Permit Services <br />MEMORANDUM <br />TO: Gibran Hashmi I MasTec, 206-372-1850 <br />FROM: Sabrina Fandler, P.E. I City of Everett Engineering/Permit Services, 425-257-7813 <br />DATE: 9/27/2019 <br />SUBJECT: Plan Review Comments for Public Works Permit Application <br />PROPOSAL: Proposed small wireless facility- attach to new utility pole. Pole and foundation to be replaced <br />with new foundation and pole/ proposed new pole shall replace existing utility light pole and <br />foundation in same location/ fiber and power permits by others. <br />LOCATION: 4030 Colby Ave <br />PERMIT#: PW1908-039 <br />This document serves as the formal correction letter for the above referenced Public Works Permit <br />Application. This permit was applied for on 8/20/2019. An informal correction letter was provided via email <br />for all three small cell sites on day 30 of the review (9/19/2019). Today (9/27/2019) is day 38 of the review. <br />With providing this formal correction letter, the City is tolling the shot clock as of this date. Upon resubmittal <br />with corrections, the shot clock will continue. If you feel that a formal tolling agreement is necessary in <br />addition to this correction letter, please contact Sabrina Fandler (Sfandler@everettwa.eov) and the tolling <br />agreement form will be provided. <br />A review of this project by the Engineering/Permit Services Division indicates that the following revisions shall <br />be made and/or the following conditions must be met: <br />1. Please resubmit the following items to the Permit Services Counter with your resubmittal once all <br />requested revisions have been made: <br />a. Transmittal Sheet: (1) available at the Permit Counter <br />b. Plans: (4) full size sets of revised plans <br />The Permit Counter is open Monday through Friday from 7:30am-12:00pm and from 1:00pm- <br />4:00pm (closed between 12:00pm-1:00pm for lunch). <br />2. The comments below were generated from this project's Overall Public Works Reviewer. If you have any <br />questions regarding these comments, please contact Sabrina Fandler with City of Everett Permit Services <br />(425-257-7813 or SFandler@everettwa.¢ov). <br />a. The Site license addendums are incorrectly cross referencing each other. Please revise to ensure <br />that the site license addendum number and address are correctly correlated. At least two of the <br />three site license addendums are affected in this way. <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.