Laserfiche WebLink
•:•M a s T e c <br />Network Solutions <br />08/16/19 <br />City of Everett- Public Works Building, Permit Counter <br />3200 Cedar St 2nd Floor <br />Everett, WA 98201 <br />VIA Permit Counter Submittal <br />RE: AT&T 17726-004-B <br />City Assigned Address: 4030 Colby Ave <br />Request to Construct Small Wireless [Facility on Replacement Structure <br />Subject to 90-day Federal Communications Commission ("FCC") Shot Clock <br />Dear Public Works: <br />On behalf of New Cingular Wireless PCS, LLC ("AT&T") we are pleased to submit this request to construct a small wireless <br />[facility on a replacement structure within the public right-of-way. This facility will enhance the capacity of AT&T's existing <br />wireless network and provide critical service improvements to the surrounding area. <br />Project Description <br />This request includes a facility that meets the definition of "small wireless facilities" pursuant to 47 C.F.R. § 1.6002(I), <br />constructed on replacement structure in the public right-of-way. <br />AT&T ID <br />Owner/Pole Type <br />Location <br />Proposed <br />Height <br />17726-004-B <br />City of Everett/Metal <br />City Assigned Address: 4030 Colby Ave <br />35' <br />Street Light <br />Public ROW <br />West Side Colby Ave <br />Approx. 35' North of 4151 St <br />List of Permits/Agreements Requested <br />AT&T has entered into a Master License Agreement with the City of Everett dated June 11, 2018. AT&T requests approval <br />of the following permits and agreements, as well as any other authorizations necessary, for its proposed small wireless <br />facility. <br />Review Process II Application <br />Public Works Permit Application (ROW) <br />Site License Addendum <br />FCC Shot Clock for Small Wireless Facilities <br />We would also like to confirm the City of Everett will review AT&T's applications pursuant to the FCC's new timelines, or <br />"Shot Clocks," for small wireless facilities, which are outlined in 47 C.F.R. § 1.6003. All authorizations related to facilities <br />to be constructed on [a] new or replacement structure[s] are required to be completed within 90 days after filing, as <br />follows: <br />• This Application was filed on 08/16/19. <br />• Absent tolling, the City of Everett must take final action by 11/14/19. <br />