1 <br />I <br />1 <br />1 <br />CONSENT DECREE EXHIBIT D <br />EVERETT LANDFILL/TIRE FIRE SITE <br />SamplM-g and Analysis Plans: Draft Sampling and Analysis Plans (SAPs) for landfill <br />gas, groundwater and surface water will be submitted to Ecology for review and approval <br />within 60 days of the effective date of this Decree. <br />New groundwater compliance monitoring and upgradient monitoring wells: New <br />groundwater monitoring wells will be installed, and existing wells abandoned as <br />described in the CMCP (attachment to Exhibit C) within 90 days of the effective date of <br />this Decree, contingent on obtaining access to the area. <br />Compliance monitoring: Compliance monitoring and associated reporting shall occur in <br />accordance with the approved CMCP (attachment to Exhibit Q. <br />City Site Manager: A City Site Manager will be designated within 30 days of the <br />effective date of this Decree. <br />Within 12 months of the effective date of this Decree, the following work shall be <br />completed, contingent upon obtaining access to the area: installation and monitoring of <br />new groundwater compliance monitoring and upgradient monitoring wells, field <br />investigation to determine the limits of buried waste, and installation and monitoring of <br />new perimeter gas monitoring network. <br />Perimeter landfill gas migration controls will be installed as soon as possible following a <br />confirmed perimeter gas exceedance in accordance with the CMCP (attachment to <br />Exhibit Q. <br />Work to be performed under potential future developed conditions will be completed in <br />conjunction with future development, triggered by development proposals. Management of <br />work to be performed under potential future developed conditions will occur consistent with the <br />review coordination process described below. <br />Review Coordination Process <br />The City shall review and have approval responsibility for development construction plans to <br />ensure compliance with Cleanup Action Plan requirements. The City shall provide opportunities <br />for Ecology's review and approval as described in the Cleanup Action Plan for at least the <br />following development submittals: <br />• Master development plans, SEPA and/or shoreline permitting documents <br />• Construction documents associated with specific action permits (building, grading permits, <br />etc.) <br />Both the City and Ecology will endeavor to provide adequate notice and review period to meet <br />the needs of both parties. For potential future development, both parties recognize the sensitivity <br />of construction schedules. <br />FINAL <br />Exhibit D Page 5 of 13 <br />