Laserfiche WebLink
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 115 <br />BICYCLE PROJECTS <br />PROJECT ID PROJECT NAME DESCRIPTION MODE COST 1 <br />CEF-E 36th Street bicycle <br />facility <br />Connection to Bike Sidewalk Path in <br />BMP - Signed route Bicycle $17,000 <br />T1-J3 Fulton St bicycle <br />facility (South) <br />Add a Bike Boulevard to the existing <br />roadway, Tier 1 project in BMP Bicycle $23,000 <br />T1-T Smith Avenue bicycle <br />facility <br />Add a bicycle boulevard. to the <br />existing roadway, Tier 1 project in <br />BMP <br />Bicycle $45,000 <br />T1-V Wall Street bicycle <br />facility <br />Add a bicycle boulevard. to the <br />existing roadway, Tier 1 project in <br />BMP <br />Bicycle $23,700 <br />T2-E Poplar Street/Baker <br />Ave bicycle facility <br />Add a bicycle boulevard to the <br />existing roadway, Tier 2 project in <br />BMP <br />Bicycle $31,000 <br />T2-T E Casino Road bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 2 project in BMP Bicycle $38,000 <br />T2-Y <br />Oakes Avenue bicycle <br />facility (Everett - <br />Pacific) <br />Add a bike boulevard facility to the <br />existing roadway, Tier 2 project in <br />BMP <br />Bicycle $242,000 <br />CEF-H2 Beverly Lane Bicycle <br />Facility <br />Add a bicycle facility to the existing <br />roadway. Bicycle $23,000 <br />CEF-K Madison St Connector <br />bicycle facility <br />Add a Bicycle Lane to the existing <br />roadway, CEF project in BMP Bicycle $85,000 <br />CEF-L <br />Mukilteo Blvd <br />Connector bicycle <br />facility <br />Add a Bicycle Lane to the existing <br />roadway, CEF project in BMP Bicycle $226,000 <br />T1-H3 26th Street bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 1 project in BMP Bicycle $49,600 <br />T1-H4 Oakes Avenue bicycle <br />facility (26th - Everett) <br />Add a bicycle boulevard to the <br />existing roadway, Tier 1 project in <br />BMP <br />Bicycle $15,600 <br />T1-H7 32nd Street bicycle <br />facility <br />Add a bicycle lane to the existing <br />roadway, Tier 1 project in BMP Bicycle $144,000 <br />T1-H8 Lombard Avenue <br />bicycle facility South <br />Add a bicycle boulevard. to the <br />existing roadway, Tier 1 project in <br />BMP <br />Bicycle $279,900 <br />T1-Q 23rd Street bicycle <br />facility <br />Add a bicycle boulevard. to the <br />existing roadway, Tier 1 project in <br />BMP <br />Bicycle $41,000